Skip to main content

New Roadtec heavy-duty tracked paver features high-density screeds

Roadtec has introduced the new heavy-duty steel track RP-2505 paver at bauma 2013. The model on display features high-density screeds with a twin tamper bar screed, which was developed and manufactured in Germany.
January 6, 2017 Read time: 1 min
RP-2505 heavy duty paver features the European developed high density screeds
1252 Roadtec has introduced the new heavy-duty steel track RP-2505 paver at bauma 2013.

The model on display features high-density screeds with a twin tamper bar screed, which was developed and manufactured in Germany.

The RP-2505 is a versatile machine capable of achieving high densities in stiffer mixes such as cold mix, base materials, and roller-compacted concrete, as well as conventional hot mix asphalt.

The screeds are electrically heated and vibratory and the twin tamper bars allow the screed to compact the material to extremely high densities. The screeds have a basic width of 2.55m and hydraulically extend to 5.06m. The screeds crown can be hydraulically adjusted from -2% to plus 4%.

The twin tamper bar screed includes dual screed controls and thermostatically-controlled screed temperatures for smooth operation.

A full width heavy-duty walkway is included on the rear of the screed, enabling easy operator access to either side. Similar to screeds on other Roadtec pavers, mounting locations for automatic grade controls are found on the two arms.

Stand:F11.111

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 12750 0 oLinkExternal www.roadtec.com www.roadtec.com false /EasySiteWeb/GatewayLink.aspx?alId=12750 false false%>

For more information on companies in this article

Related Content

  • Putzmeister adds five-section pump
    January 6, 2017
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Putzmeister adds five-section pump
    April 19, 2013
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Wirtgen launches new Slipform Paver range
    January 6, 2017
    Among a record 29 world releases, Wirtgen has unveiled its new specialist concrete paving machines at bauma 2013. The SP 81 / SP 81i, the SP 82 / SP 82i and the SP 84 / SP 84i are highly flexible machines for paving concrete profiles of varying sizes. The SP 81 / SP 81i can produce sewerage drains, concrete barriers, kerbstones or narrow paths up to 2.2m high and 3.0m wide as standard.
  • Wirtgen launches new Slipform Paver range
    April 16, 2013
    Among a record 29 world releases, Wirtgen has unveiled its new specialist concrete paving machines at bauma 2013. The SP 81 / SP 81i, the SP 82 / SP 82i and the SP 84 / SP 84i are highly flexible machines for paving concrete profiles of varying sizes. The SP 81 / SP 81i can produce sewerage drains, concrete barriers, kerbstones or narrow paths up to 2.2m high and 3.0m wide as standard.