Skip to main content

New cost-saving Case CE midi-excavators

CNH Construction marketing director Jean-Patrick Yekpe has highlighted the money-saving potential of Case Construction Equipment’s new midi-excavators, unveiled at bauma 2013. The Tier 4 Final requirements of the CX75C SR and CX80C have been met, says Yekpe, through the use of cooled exhaust gas recirculation (CEGR) combined with a diesel oxidation catalyst system. “When the soot is coming out of the engine as smoke and touches the platinum inside the engine you get an oxidation, and as a consequence of thi
January 6, 2017 Read time: 2 mins
Jean-Patrick Yekpe has highlighted the money saving potential of Case CE’s new bauma 2013 unveiled midi-excavators
1595 CNH Construction marketing director Jean-Patrick Yekpe has highlighted the money-saving potential of 176 Case Construction Equipment’s new midi-excavators, unveiled at 688 Bauma 2013.

The Tier 4 Final requirements of the CX75C SR and CX80C have been met, says Yekpe, through the use of cooled exhaust gas recirculation (CEGR) combined with a diesel oxidation catalyst system.

“When the soot is coming out of the engine as smoke and touches the platinum inside the engine you get an oxidation, and as a consequence of this chemical reaction you do not have any more soot coming out,” explained Yekpe.

“The benefit for the customer of this technology is that you do not need a diesel particulate filter. The main inconvenience of this (DPF) is that it is costly,” he said.

Meanwhile Phil Marshall, UK business manager for Case Construction Equipment (Case CE), said the new midi-excavators represented a step back into an important market for the brand. “This is particularly so within my home country, the UK,” he said.

The CX75C SR and CX80C are said by Case to generate 9% more hydraulic power than their predecessors, and 148litres/min of pump flow compared to the previous 136litres/min. Cycle times are said to be reduced and digging force improved by up to 3% with Case CE’s new midi-excavators.

To increase uptime, the bauma 2013-launched machines feature a larger 120litre fuel tank, said to be easily fillable with the optional electric refuelling pump. Efficient maintenance is another advantage of the CX75C SR and the CX80C, stressed Case CE.

Both new midi-excavators have a choice of mono-boom, swing-boom and offset-boom, four auxiliary hydraulic control systems (hand or foot controlled), three track options (rubber or steel shoes) and two dipper-stick lengths.

Stand: F7.713/3

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 12691 0 oLinkExternal www.CaseCE.com www.CaseCE.com false /EasySiteWeb/GatewayLink.aspx?alId=12691 false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Hitachi aims for 20-30% growth in five years through mining offer
    April 18, 2013
    Hitachi Construction Machinery (Europe) president and chief executive Moriaki Kadoya believes HCME can achieve 20-30% sales revenue growth in the next five years through its wide range of mining-suited machines. The Hitachi Group subsidiary has a vast range of larger machines, including six crawler excavators – the 1200, 1900, 2600, 3600, 5600, and 800tonne 8000 model – which, Kadoya said, leaves HCME in an ideal position to pursue its ambitious growth target. The construction equipment industry giant also
  • Doka showcases Cut&Cover tunnel construction solution
    January 6, 2017
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Doka showcases Cut&Cover tunnel construction solution
    February 7, 2013
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • ContiTech Conveyor Belt Group showcases MegaPipes solution
    February 26, 2013
    The ContiTech Conveyor Belt Group’s “innovative and environmentally friendly” conveyor belt solutions include the new MegaPipes. With an external diameter of up to 900mm, ContiTech claims the product doubles the capacities compared to conventional closed-trough belts and enables the transport of crushed ore downstream of the primary crusher or of bulky goods in the industrial sector applications.