Skip to main content

Mumbai Airport on the up

To handle the increasing number of passengers and larger cargo volumes, Chhatrapati Shivaji International Airport in Mumbai, India, has been undergoing a continuous process of expansion since 2006. As part of the ambitious project Indian construction and mechanical engineering company Larsen & Toubro (L&T) is building a new multi-storey parking structure and a new air traf c control tower. Among equipment being used are Terex CTT 181-8 and CTT 231-10 tower cranes. The two flat top tower cranes are mainly u
August 24, 2012 Read time: 1 min
A Terex crane working at Mumbai Airport
To handle the increasing number of passengers and larger cargo volumes, Chhatrapati Shivaji International Airport in Mumbai, India, has been undergoing a continuous process of expansion since 2006.

As part of the ambitious project Indian construction and mechanical engineering company Larsen & Toubro (L&T) is building a new multi-storey parking structure and a new air traf c control tower. Among equipment being used are 1222 Terex CTT 181-8 and CTT 231-10 tower cranes. The two flat top tower cranes are mainly used to provide the workers with the steel and concrete needed to build the two structures.

Able to reach heights of nearly 30m and with 35m-long jibs, they can lift up to 10tonnes for the parking structure and 8tonnes for the tower.

The projects are scheduled for completion by December, 2013.

For more information on companies in this article

Related Content

  • Sennebogen launches new 655 HD heavy-duty cycle crawler crane
    January 6, 2017
    Sennebogen’s new 655 HD heavy-duty cycle crawler crane is one of several innovations on the company’s stand at Bauma. Designed for heavy-duty tasks on construction sites and in the extractive industry, the 655 D can be used with a dragline bucket or in foundation construction. The 55tonne capacity machine can be used with a 3.5m3 Hendrix dragline bucket, for instance, and it uses two 16tonne winches driven by high-pressure regulated variable displacement hydraulic motors. There is a continuously-variable fr
  • Sennebogen launches new 655 HD heavy-duty cycle crawler crane
    February 15, 2013
    Sennebogen’s new 655 HD heavy-duty cycle crawler crane is one of several innovations on the company’s stand at Bauma. Designed for heavy-duty tasks on construction sites and in the extractive industry, the 655 D can be used with a dragline bucket or in foundation construction. The 55tonne capacity machine can be used with a 3.5m3 Hendrix dragline bucket, for instance, and it uses two 16tonne winches driven by high-pressure regulated variable displacement hydraulic motors. There is a continuously-variable fr
  • The A14 Cambridge to Huntingdon improvement scheme takes shape
    May 31, 2017
    Highways England’s project manager gives sneak peek into progress on the UK’s biggest road upgrade now under construction. Road construction workers often find interesting buried items when building roads and the UK’s A14 Cambridge to Huntingdon improvement scheme is proving the point. It’s been less than half a year since construction started on the €1.76 billion A14 scheme, Highways England’s largest ongoing project. Highways England is the wholly government-owned company responsible for modernising, main
  • I Lift NY crane places first girder on New York’s Tappan Zee Bridge
    June 25, 2015
    One of the world’s largest cranes has placed the first steel girder assembly for the approach span of the new NY Bridge, often called the Tappen Zee Bridge in New York. The barge-mounted I Lift NY super crane with its nearly 100m boom slowly picked up the 125m unit from its delivery barge and gently lowered it onto concrete pedestals in the Hudson River, near the Rockland County side of the bridge. The super crane will install even larger sections of the new bridge, some of which weigh around 907tonne