Skip to main content

Missouri’s Blanchette Bridge gets smaller and smaller

Missouri’s Blanchette Bridge is now even more abridged. Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012. More than 2,000tonnes of steel dropped over 300m into the Missouri River. A 107m section of the Blanchette Bridge was brought down last month. The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.
December 10, 2012 Read time: 1 min
Missouri’s Blanchette Bridge is now even more abridged.

Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012.

As a result of the latest explosion over 300m of steel, weighing more than 2,000tonnes, dropped into the Missouri River.

A 107m section of the Blanchette Bridge was brought down last month.

The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The bridge that keeps getting smaller www.demolitionnews.com false http://www.demolitionnews.com/2012/12/04/video-the-bridge-that-keeps-getting-smaller/ false false%>

Related Content

  • First public outing for Liebherr tower crane at INTERMAT
    April 20, 2012
    Liebherr used INTERMAT 2012 to show its new 380 EC-B 16 Litronic flat-top crane. The 380tonne unit tops the 15-model range, which starts from 50tonnes. The new “flagship” can lift loads of up to 3,400kg at its 75m maximum radius. With the Litronic system, the 380 EC-B 16 can provide up to 20% more load lift at the push of a button. This is achieved by integrating the load-moment limiting system, the ABB operating-range limiting system and the MDA machine data evaluation program.
  • Komatsu Europe International introduces its new HM300-3 articulated truck
    January 6, 2017
    Komatsu Europe International’s recently introduced HM300-3 articulated truck has a flywheel horsepower of 242kW and is powered by a Komatsu SAA6D125E-6 engine that is EU Stage IIIB and EPA Tier 4 Interim emission certified.
  • Komatsu Europe International introduces its new HM300-3 articulated truck
    February 7, 2012
    Komatsu Europe International’s recently introduced HM300-3 articulated truck has a flywheel horsepower of 242kW and is powered by a Komatsu SAA6D125E-6 engine that is EU Stage IIIB and EPA Tier 4 Interim emission certified.
  • VIDEO: Wrong way down a Chinese motorway
    April 19, 2016
    It takes courage to drive down the wrong side of a motorway and a lot of nerve. But this driver in China appears to have both in large quantities as he heads off on his journey. Apparently, his passenger is his equal when it comes to sangfroid. He even appears in camera shot with a big smile on his face. Luckily no crash took place. However, the video stops just before the taxi arrives at something in the road. Was it a road block? If that driving experience wasn’t too unsettling for anyone, then c