Skip to main content

Missouri’s Blanchette Bridge gets smaller and smaller

Missouri’s Blanchette Bridge is now even more abridged. Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012. More than 2,000tonnes of steel dropped over 300m into the Missouri River. A 107m section of the Blanchette Bridge was brought down last month. The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.
December 10, 2012 Read time: 1 min
Missouri’s Blanchette Bridge is now even more abridged.

Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012.

As a result of the latest explosion over 300m of steel, weighing more than 2,000tonnes, dropped into the Missouri River.

A 107m section of the Blanchette Bridge was brought down last month.

The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The bridge that keeps getting smaller www.demolitionnews.com false http://www.demolitionnews.com/2012/12/04/video-the-bridge-that-keeps-getting-smaller/ false false%>

Related Content

  • LiuGong aims to double US$700m export sales in 3 years
    April 15, 2013
    A senior LiuGong figure has revealed that the Chinese construction manufacturing giant is looking to double its US$700million overseas sales for 2012 in the next three years. Speaking at bauma 2013 Zeng Guang’an, the company’s vice chairman and president, explained how the ambitious international sales target was getting closer to being realised.
  • CTE develops new high reach access platform
    January 6, 2017
    A new platform line has been launched by CTE, the B-Lift 390 High Range, a truck-mounted high range telescopic platform which is able to meet the requirements of various markets. The platform reaches 39 m of working height with 26.3m of maximum outreach and 450kg of maximum loading capacity. It has a telescopic boom (4 elements) with main boom and 3 telescopic extensions and H stabilisation system.
  • CTE develops new high reach access platform
    February 15, 2013
    A new platform line has been launched by CTE, the B-Lift 390 High Range, a truck-mounted high range telescopic platform which is able to meet the requirements of various markets. The platform reaches 39 m of working height with 26.3m of maximum outreach and 450kg of maximum loading capacity. It has a telescopic boom (4 elements) with main boom and 3 telescopic extensions and H stabilisation system.
  • Advanced tyre monitoring from Michelin
    January 6, 2017
    Michelin Earthmover says that its new OperTrak system offers a comprehensive, easy to use web-based tyre and rim management solution. This package can monitor tyre performance and optimise budgeting, forecasting and inventory, allowing users to gain maximum value from tyres. Key benefits of using the system include real time web-based data and information flow and the system provides a comprehensive fleet inspection tool. It also allows users to carry out customisable budgeting and forecasting while offerin