Skip to main content

Metrostav and Bertelsen & Garpestad in E8 deal

The Norwegian project includes 10km of new road and an 870m-long bridge across the Ram Fjord, part of the European route E8 between Norway and Finland.
By David Arminas June 9, 2023 Read time: 2 mins
Construction of the bridge and highway is expected to start at the beginning of next year and end in July 2026 (image courtesy Norwegian Public Roads Administration - Statens vegvesen)

A consortium of Metrostav Norway and Bertelsen & Garpestad have won the main contract for a section of the E8 highway between Sørbotn and Laukslett.

The project includes 10km of new road, an 870m-long bridge across the Ram Fjord as well as several smaller bridges. Construction is expected to start at the beginning of next year and end in July 2026.

The Metrostav Norway consortium’s bid was chosen over those from NCC Norway and the consortium of Hæhre and PNC.

The E8 is a 1,410km European route that goes from Tromsø, Norway, to Turku in Finland and includes five tunnels – and is notable for difficult winter conditions. Tromsø, with a population of just under 80,000, is Norway’s largest northern city – and 355km north of the Arctic Circle. Turku, a city of 200,000, is located at the mouth of the Aura river in the southwest corner of Finland.

Both Indre Laukslett and Sørbotn are villages on the edge of Ram Fjord, with Laukslett being north of Sørbotn and about 22km south of Tromsø. The E8 project between Indre Laukslett and Sørbotn will cost around €195 million, according to Nordisk Tillväxt, a strategic planning and pre-construction consultancy operating across the Nordics. It provides support throughout pre-qualification, tender and bid processes.

The 10m-wide Sørbotn and Laukslett section of the E8 will have avalanche protection at critical points and a reindeer crossing near Sørbotn will be constructed.

Seafill work for bridge pilings has already been tendered.

For more information on companies in this article

Related Content

  • Second Tees Valley Viaduct proposed at Middlesbrough
    March 19, 2019
    Proposals for a second crossing over the Tees River in northern England have gone out to public consultation, according to media reports. The Tees Valley Combined Authority, the local authority, said there are two options to take the A19 trunk road over the River Tees at the city of Middlesbrough. One plan, costing between €235-292 million, would be for a bridge parallel to the existing one where each bridge would traffic in only one directions. The other option is for a four-lane €350 million brid
  • Financial close for Louisiana’s Calcasieu Bridge
    August 19, 2024
    Sacyr said that the project is the company’s first transportation infrastructure private-public partnership contract in the US and calls for a total of $2.27 billion in construction investment.
  • A tricky road update is planned for an important rural road in Brazil
    September 27, 2013
    Brazilian consultant SOTEPA has been closely involved with infrastructure improvements in a series of projects in the southern state of Santa Catarina. One of the most important of these has been design work for the SC-477 state highway, which connects the east of the state to Brazil’s Littoral zone and the BR-101 federal highway. The SC-477 has had to be upgraded as part of it has been unsurfaced, without an asphalt surface between Itaiópolis and Doutor Pedrinho. The road provides an important link for the
  • Significant wins for Signify
    April 19, 2021
    Signify is transforming Gran Canaria’s most important highway, known as GC-1, into a smart highway with the company’s Interact City system