Skip to main content

Massenza redesigns its range of three PMB plants to deliver less clogging and faster production volumes

April 11, 2025 Read time: 2 mins
bauma 2025

Massenza has redesigned all three models in its PMB plant range. Its engineers have changed the design of the mixing tanks to reduce the likelihood of material clogging; reconfigured the medium-sized machine to allow a fast expansion of production volumes; and added control rooms to the two larger models.

The three models in the Massenza PMB plant range are the Smart which can produce between five and 10 tonnes of polymer modified bitumen (PMB) an hour; the Klever which can produce between 10 and 20 tonnes and the SuperKlever which can produce between 25 and 30 tonnes.  

The Smart is an entry-level plant, while the Klever and SuperKlever benefit from more automation and production-reporting capabilities.

The Klever now has space for a second mill to be added so that, if customers find that demand for PMB is ramping up, they can almost double their capacity without having to invest in a whole new plant.

“We were finding that quite a few customers were buying the medium-sized plant and then, after a few years, they needed to produce more so had to buy a second plant. Now they just need to add the second mill,” according to Massenza.

For the Klever and SuperKlever PMB plants, Massenza has added control rooms containing the PLC and screen. Providing cool air in the summer and warm air in the winter, this update aims to make life more comfortable for the plant operators.

“We have already supplied two new-generation plants to Saudi Arabia, one to Romania, one to Albania and one to the UK,” said Massenza. 

For more information on companies in this article

Related Content

  • G&Z is seeing healthy sales for pavers
    May 15, 2019
    Guntert & Zimmerman (G&Z) is experiencing healthy sales for its concrete pavers, with the factory also benefiting from upgrades. Improved manufacturing processes at the G&Z factory in Ripon, California, will help reduce delivery times for customers. This is important given the strong orders that the G&Z plant is handling at present, with the workforce also the highest for many decades. Rolf Guntert is executive vice president, sales and said, “We’re continuing to grow.”
  • Eurobitume Congress: Prague promises
    June 22, 2016
    Held every four years, the Eurasphalt and Eurobitume congresses have a reputation for revealing developments that will shape the future of bitumen use on Europe’s roads. This year’s event in Prague promises to uphold that reputation. By Kristina Smith The list of locations for the Eurobitume and Eurasphalt (E&E) Congresses reads like a traveller’s dream itinerary: Strasbourg, Barcelona, Vienna, Copenhagen, Istanbul. Now the beautiful city of Prague has been added to the list. Between 1-3 June, presenter
  • New tunnelling technology offering greater efficiency
    January 4, 2017
    Tunnelling technology is seeing major developments that will boost construction efficiency - Mike Woof writes Both in tunnel drilling and TBM systems, new machines are now being built that offer major gains in performance. Sandvik is introducing a number of major new models developments to its tunnelling drill range. Three new tunnelling jumbos are now available that suit different drilling requirements, the DD422iE, DT912D and DT922i. The firm says that its advanced DD422iE rig offers major advantage
  • Benninghoven | Reducing the carbon footprint in asphalt production
    May 5, 2023
    Working more efficiently with sustainable and economical technologies is the challenge of today and tomorrow. Solutions from Benninghoven lower emissions and secure the future of asphalt mixing plant sites.