Skip to main content

Massenza redesigns its range of three PMB plants to deliver less clogging and faster production volumes

April 11, 2025 Read time: 2 mins
bauma 2025

Massenza has redesigned all three models in its PMB plant range. Its engineers have changed the design of the mixing tanks to reduce the likelihood of material clogging; reconfigured the medium-sized machine to allow a fast expansion of production volumes; and added control rooms to the two larger models.

The three models in the Massenza PMB plant range are the Smart which can produce between five and 10 tonnes of polymer modified bitumen (PMB) an hour; the Klever which can produce between 10 and 20 tonnes and the SuperKlever which can produce between 25 and 30 tonnes.  

The Smart is an entry-level plant, while the Klever and SuperKlever benefit from more automation and production-reporting capabilities.

The Klever now has space for a second mill to be added so that, if customers find that demand for PMB is ramping up, they can almost double their capacity without having to invest in a whole new plant.

“We were finding that quite a few customers were buying the medium-sized plant and then, after a few years, they needed to produce more so had to buy a second plant. Now they just need to add the second mill,” according to Massenza.

For the Klever and SuperKlever PMB plants, Massenza has added control rooms containing the PLC and screen. Providing cool air in the summer and warm air in the winter, this update aims to make life more comfortable for the plant operators.

“We have already supplied two new-generation plants to Saudi Arabia, one to Romania, one to Albania and one to the UK,” said Massenza. 

For more information on companies in this article

Related Content

  • Volvo wheeled at work in Qatar sand plant
    May 29, 2013
    Wheeled loaders are operating in the world’s largest sand cleaning plant. Located 50km from the capital Doha, Qatari Primary Materials (QPMC) operates one of the world’s largest sand cleaning plants. With temperatures reaching 40°C and 64,000tonnes of aggregates needed to be handled for every export shipment, Volvo Construction Equipment’s wheeled loaders are helping with operations in the gas-rich state. Volvo CE is involved in one of the country’s largest industrial operations, having provided QPMC with a
  • Benninghoven’s mobile asphalt plant
    May 24, 2019
    Benninghoven says that its new ECO asphalt mixing plant combines high output and mobility, while its TBA asphalt mixing plant is now available with a hot-gas generator for the first time. Made in the firm’s German factory, the new ECO plants can produce 100-320tonnes/hour of asphalt. The new plants are said to combine the latest innovations in asphalt production technology from Benninghoven with a high standard of manufacturing. Mobility is a key feature as the plant comes in compact container sizes. Thi
  • Iterchimica trials G+ graphene modifier from Directa Plus
    February 7, 2020
    UK village gets trial paving of a super modifier containing graphene.
  • RMD Kwikform: the role of temporary works in the age of BIM
    April 19, 2018
    Formwork and shoring are no longer isolated services that stand outside the design process of infrastructure projects, as Simon Dowd* explained In recent years, the roles of suppliers have changed as client and main contractors require more visibility and data from their construction sites. Due to the requirements of BIM - building information modelling - and the adoption of digital processes, it is no longer the role of a temporary works business to simply provide formwork and shoring. Simon Dowd said