Skip to main content

Lombardini boosts KDi engine output towards 100kW

Lombardini is moving ever closer to offering a 100kW engine as part of its strategy to grow the Kohler KDi series above the 56kW maximum output that currently sits at the top of its range. “We have developed a 3.4litre, four-cylinder engine that will take us to 100kW,” said Lombardini’s marketing and communications manager Nino De Giglio. “The engine is currently being tested and will go into production towards the end of 2014.” De Giglio said the arrival of the new 100kW engine, with its 480Nm of torque, c
April 18, 2013 Read time: 1 min
Lombardini will break the 100kW barrier when its 3.4litre KDi engine goes into production in 2014
2277 Lombardini is moving ever closer to offering a 100kW engine as part of its strategy to grow the 2278 Kohler KDi series above the 56kW maximum output that currently sits at the top of its range.

“We have developed a 3.4litre, four-cylinder engine that will take us to 100kW,” said Lombardini’s marketing and communications manager Nino De Giglio. “The engine is currently being tested and will go into production towards the end of 2014.”

De Giglio said the arrival of the new 100kW engine, with its 480Nm of torque, could allow OEMs to downsize.

“With its high power density, we expect our new 3.4litre KDi engine to be attractive to OEMs looking to downsize from 4.4litre engines and seek out higher fuel efficiency,” he said.

Stand: A4.402

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 48843 0 oLinkExternal www.LombardiniGroup.it www.LombardiniGroup.it false /EasySiteWeb/GatewayLink.aspx?alId=48843 false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • PERI unveils VARIOKIT heavy-duty truss girder
    January 6, 2017
    PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity
  • PERI unveils VARIOKIT heavy-duty truss girder
    April 18, 2013
    PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity
  • Volvo CE president speaks of industry giant’s goals for bauma 2013
    January 6, 2017
    Volvo Construction Equipment president Pat Olney has stressed the importance of the bauma show to the industry giant ahead of the 2013 event. Speaking during the recent inauguration of Volvo CE’s new Americas HQ in Shippensburg, Pennsylvania, he said: “Bauma is a major show in Europe and also attracts international visitors.
  • Volvo CE president speaks of industry giant’s goals for bauma 2013
    April 9, 2013
    Volvo Construction Equipment president Pat Olney has stressed the importance of the bauma show to the industry giant ahead of the 2013 event. Speaking during the recent inauguration of Volvo CE’s new Americas HQ in Shippensburg, Pennsylvania, he said: “Bauma is a major show in Europe and also attracts international visitors.