Skip to main content

Lombardini boosts KDi engine output towards 100kW

Lombardini is moving ever closer to offering a 100kW engine as part of its strategy to grow the Kohler KDi series above the 56kW maximum output that currently sits at the top of its range. “We have developed a 3.4litre, four-cylinder engine that will take us to 100kW,” said Lombardini’s marketing and communications manager Nino De Giglio. “The engine is currently being tested and will go into production towards the end of 2014.” De Giglio said the arrival of the new 100kW engine, with its 480Nm of torque, c
April 18, 2013 Read time: 1 min
Lombardini will break the 100kW barrier when its 3.4litre KDi engine goes into production in 2014
2277 Lombardini is moving ever closer to offering a 100kW engine as part of its strategy to grow the 2278 Kohler KDi series above the 56kW maximum output that currently sits at the top of its range.

“We have developed a 3.4litre, four-cylinder engine that will take us to 100kW,” said Lombardini’s marketing and communications manager Nino De Giglio. “The engine is currently being tested and will go into production towards the end of 2014.”

De Giglio said the arrival of the new 100kW engine, with its 480Nm of torque, could allow OEMs to downsize.

“With its high power density, we expect our new 3.4litre KDi engine to be attractive to OEMs looking to downsize from 4.4litre engines and seek out higher fuel efficiency,” he said.

Stand: A4.402

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 48843 0 oLinkExternal www.LombardiniGroup.it www.LombardiniGroup.it false /EasySiteWeb/GatewayLink.aspx?alId=48843 false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Double delight for Powerscreen and DUO in Ghana
    January 6, 2017
    Powerscreen has signed DUO Africa as its first distributor in Ghana. And, as the ink dried on the contract at bauma, the company unveiled a deal to supply three crushing and screening trains. DUO Africa will sell equipment into Ghana and support Powerscreen products in the sub-Saharan region. Among its first contracts is to supply two Powerscreen XA400 primary jaw crushers, two 1000 Maxtrak cone crushers and two Chieftain 2100 triple-deck screens to UK-based Hawk Plant for a number of aggregate crushing ope
  • Double delight for Powerscreen and DUO in Ghana
    April 16, 2013
    Powerscreen has signed DUO Africa as its first distributor in Ghana. And, as the ink dried on the contract at bauma, the company unveiled a deal to supply three crushing and screening trains. DUO Africa will sell equipment into Ghana and support Powerscreen products in the sub-Saharan region. Among its first contracts is to supply two Powerscreen XA400 primary jaw crushers, two 1000 Maxtrak cone crushers and two Chieftain 2100 triple-deck screens to UK-based Hawk Plant for a number of aggregate crushing ope
  • Peri launched UP MDS Formwork at INTERMAT 2012
    January 6, 2017
    Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of
  • Peri launched UP MDS Formwork at INTERMAT 2012
    February 3, 2012
    Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of