Skip to main content

Link deals awarded in Mexico

In Mexico the contractor Ideal has been awarded a package of highway and road works worth a total of US$667 million in all.
February 24, 2012 Read time: 1 min
In Mexico the contractor 3136 Ideal has been awarded a package of highway and road works worth a total of US$667 million in all. The concession package is for a highway measuring 169km and road sections that are 111km and 30km long. The highway connects Guadalajara and Tepic while the 111km road is in Guadalajara and the 30km road is in Tepic. The agreement is for a 48 month construction period with work commencing in January 2012. Ideal is part of the 3135 Carso group and the company will pay $342 million to the authorities now that it has the package of works, with the rest of the payment to come later. Seven firms tendered for the works in all, including ideal.

For more information on companies in this article

Related Content

  • Qatar's strategy
    February 7, 2012
    Qatar's Public Works Authority is opening the tender process for two key infrastructure projects, with a major focus on highway construction. These tenders include the F-Ring Road project.
  • Korean contractor conquers in Qatar construction contract
    May 21, 2014
    In Qatar the public works authority, Ashghal, has awarded a highway construction deal worth US$910 million to South Korean firm Daewoo Engineering and Construction (Daewoo E&C). The deal is for a 42km section of road, which forms part of the New Orbital Highway and Truck Route project. The 42km stretch would connect the Dukhan Highway and the Al Khor Link Road, and will feature five interchanges and a number of bridges. The 14 lane road will also feature wastewater treatment systems and smart road traffic c
  • Brazil’s new road links being planned
    February 2, 2022
    Important new road links are being planned for Brazil.
  • Two Polish road projects moving aheaaad
    March 9, 2017
    Work on two sections of the S17 highway in Poland will now go ahead following the granting of permission from the local authorities in the Mazowieckie area. In total the two stretches of the S17 will measure over 25km long. One of the stretches will connect Gonczyce with the ring road around Garwolin and will measure 12.2km. The other stretch runs from Lubelskie through Mazowieckie to Gonczyce and is 13km long. The work is being carried out by the contractor Budimex. Work on a further 95km stretch of the S1