Skip to main content

Liebherr is offering a versatile and mobile new concrete mixing plant

Liebherr’s new Mobilmix 2.5 is a container-mounted mixing plant system developed for large construction sites. This plant offers a capacity of 110m3/hour of compacted concrete and is designed for mobility. The plant’s components are housed in modular containers that can be easily transported and linked together on-site. Once erected, the container modules form a weather-proof structure that can be equipped with additional insulation for use in severe climatic conditions.
January 6, 2017 Read time: 1 min
718 Liebherr’s new Mobilmix 2.5 is a container-mounted mixing plant system developed for large construction sites.

This plant offers a capacity of 110m 3 /hour of compacted concrete and is designed for mobility.

The plant’s components are housed in modular containers that can be easily transported and linked together on-site. Once erected, the container modules form a weather-proof structure that can be equipped with additional insulation for use in severe climatic conditions.

Two Mobilmix 2.5 plants can be operated in tandem, effectively doubling output to 220m3/hour if required. The mixing plant can be extended with high-pressure mixer cleaning equipment, admixture weighers, dust filters and water tanks.

%$Linker: External 0 0 0 oLinkExternal www.liebherr.com Liebherr false http://www.liebherr.com/ false false%>

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Hidromek adds long-reach excavators
    April 15, 2013
    Hidromek has added long-reach options for three of its excavators – the HMK220LC, HMK300LC and the HMK370LC. Aimed at special earthmoving and drainage applications, the excavators carry LR branding and have ground level reach of 15.06, 18.19 and 16.6m respectively. Load over heights range from 10.85m with the HMK220LC LR to 12.59 with the HMK300LC LR. The long-reach HMK220LC delivers 7,300kgf of bucket digging force with a 0.45m3 bucket, with the figures rising to 1m3 and 11,400kgf with the HMK370LC LR.
  • INTERMAT is new Hemisphere for Canadian firm
    January 6, 2017
    It’s a case of entering a new Hemisphere for one Canadian firm at INTERMAT. Hemisphere GPS is highlighting its wide range of machine control and guidance systems during its show debut. The ergonomic Earthworks Z300 for dozers, a new system being exhibited by the Calgary-based firm, is said to improve grade control accuracy while reducing rework and the number of required passes. A further new Hemisphere GPS system on show is the S320 GNSS Survey Receiver. The model includes SMS communication, GSM auto cor
  • INTERMAT is new Hemisphere for Canadian firm
    April 19, 2012
    It’s a case of entering a new Hemisphere for one Canadian firm at INTERMAT. Hemisphere GPS is highlighting its wide range of machine control and guidance systems during its show debut. The ergonomic Earthworks Z300 for dozers, a new system being exhibited by the Calgary-based firm, is said to improve grade control accuracy while reducing rework and the number of required passes. A further new Hemisphere GPS system on show is the S320 GNSS Survey Receiver. The model includes SMS communication, GSM auto cor
  • Smoother quieter excavators from Doosan unveiled at INTERMAT
    January 6, 2017
    Doosan’s new Stage IIIB-compliant DX300LC-3 and DX340LC-3 crawler excavators are said to offer 6% to 17% higher productivity, along with fuel saving and reduced costs. The 30 and 35tonne machines have a new ROPS and OPG-certified pressurised cab. A heated air suspension seat and a new cab suspension cut vibration by 20% and reduce the sound level in the cab to 71d(B)A.