Skip to main content

L506C and L508C wheeled loaders join Liebherr’s compact line-up

Liebherr’s compact L506C and L508C wheeled loaders both have a very low overall height, aiding stability and versatility when working in congested site conditions. Weighing 5,180kg and 5,600kg respectively the two loaders offer tipping loads of 3,450kg and 3,850kg. The L506C is powered by a 45kW (61hp) engine and comes with a 0.8m3 bucket, while the L508C uses a 49kW (67hp) motor and a 1.0m3 bucket. Both machines have a comfortable cab with plenty of glass, for good all-round visibility. The lifting cylinde
January 6, 2017 Read time: 1 min
Stability and performance are claimed for Liebherr’s new compact loaders
Liebherr’s compact L506C and L508C wheeled loaders both have a very low overall height, aiding stability and versatility when working in congested site conditions. Weighing 5,180kg and 5,600kg respectively the two loaders offer tipping loads of 3,450kg and 3,850kg. The L506C is powered by a 45kW (61hp) engine and comes with a 0.8m3 bucket, while the L508C uses a 49kW (67hp) motor and a 1.0m3 bucket.

Both machines have a comfortable cab with plenty of glass, for good all-round visibility. The lifting cylinder is centrally mounted on the tapered boom for improved visibility to the working area. With pallet forks fitted both machines can lift in excess of 2 tonnes.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.Liebherr.com www.Liebherr.com false http://www.liebherr.com/ false false%>

Related Content

  • Terex sales wish for Genie
    January 6, 2017
    The recently launched CE-compliant Genie GS 4047 compact electric scissor lift has a 14metre working height.
  • Terex sales wish for Genie
    February 29, 2012
    The recently launched CE-compliant Genie GS 4047 compact electric scissor lift has a 14metre working height.
  • Peri launched UP MDS Formwork at INTERMAT 2012
    January 6, 2017
    Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of
  • Peri launched UP MDS Formwork at INTERMAT 2012
    February 3, 2012
    Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of