Skip to main content

Kids in Cars: from curious to furious during the summer road trip

Kids start to complain about the amount of time in a car after two 2 and 23 minutes of driving, according to research in the UK. Around that time, the driver will hear from the back seat the first of a long list of complaints: “Are we nearly there yet?” And by 2 hours and 37 minutes, angry rows have broken out. These squabbles are almost inevitable, noted the study from the UK’s Highways England. Nearly 80% of families say kids quarrel during long-distance summer trips. Many parents said this ha
August 20, 2015 Read time: 2 mins
Here at last, and about time, too.
Kids start to complain about the amount of time in a car after two 2 and 23 minutes of driving, according to research in the UK.

Around that time, the driver will hear from the back seat the first of a long list of complaints: “Are we nearly there yet?”

And by 2 hours and 37 minutes, angry rows have broken out.

These squabbles are almost inevitable, noted the study from the UK’s Highways England. Nearly 80% of families say kids quarrel during long-distance summer trips.

Many parents said this happens within the first hour of a trip. For that reason, Simon Sheldon-Wilson, Highways England’s director of customer operations and a father of four, urged driving dads and moms to take a break sooner rather than later.

“A decent break should help stop kids being bored and hopefully prevent arguments from stressing your family before you’ve reached your destination,” he said. “Our survey suggests parents should plan a break around two hours in, to help young passengers cope with the boredom.”

In total, 291 drivers completed the online survey, which showed the average summer journey would last 3 hours and 49 minutes.

Despite the length of the journey, 55% of drivers said they didn’t plan to take any breaks during the trip, other than quick toilet stops.

Around a quarter of respondents said their summer journey would take more than 5 hours and 16% said they planned to travel non-stop.

“Drivers who plan their trips tend to have better journeys,” said Sheldon-Wilson.

“They factor in time for rest stops, so the driver can re-focus and the kids don’t get bored. They also spend time choosing the best route – rather than blindly picking the fastest option in their satellite navigation system, only to find it’s anything but.”

Related Content

  • BIM pilot project for Peri in Germany
    April 12, 2016
    Peri is showcasing one of its latest contract wins on its stand at bauma 2016 as part of a focus on projects which aims to demonstrate the company’s wider capabilities. The formwork specialist recently won a contract with joint venture contractor Max Bögl / Porr on the Filstal railway bridge, a pilot project for the use of building information modelling (BIM). The Filstal bridge, which is on the new high-speed line between Stuttgart and Ulm, is one of four projects chosen by Germany’s Federal Ministry of Tr
  • Efficient dozing with Liebherr
    May 6, 2022
    Bulldozers were amongst the first items of construction equipment to benefit from the use of machine control technology.
  • Machine control technology allows more efficient paving
    March 3, 2015
    In the US, a specialist contractor is making savings with new 3D technology for concrete paving. US contractor Gehring Construction is a specialist in concrete paving and is a long-time customer of GOMACO. Having bought its first GOMACO unit in 1973, Gehring has a good deal of experience in this segment. The company is now using some of the latest machine control technology, having bought a Topcon Millimetre GPS 3D stringless system, which has been used on a bypass project around the US city of Colombus. T
  • Durability is crucial while warm mix technology can help disaster recovery
    February 21, 2013
    Why durability is crucial for both emerging and developed economies, and how warm mix technology can help disaster recovery - Kristina Smith reports. When CORE Construction, a 100% owned Ghanaian company, started working on road construction projects five years ago, it was difficult to source the right bituminous mixes. “In the past, most construction firms had a number of challenges when it came to bituminous works, since the local capacity was not well-developed,” said CORE CEO Frank Lartey. CORE’s soluti