Skip to main content

Jakarta gets ‘vehicle-free’ streets on Sunday mornings

All motorised vehicles are now barred from entering two of the busiest streets in Indonesian capital Jakarta for five hours every Sunday morning as part of a city-wide bid to cut pollution levels. The ban covering Jalan Sudirman and Jalan Thamrin between 6 am and 11am each Sunday began on Sunday 13 May, 2012.
May 17, 2012 Read time: 1 min
All motorised vehicles are now barred from entering two of the busiest streets in Indonesian capital Jakarta for five hours every Sunday morning as part of a city-wide bid to cut pollution levels.

The ban covering Jalan Sudirman and Jalan Thamrin between 6 am and 11am each Sunday began on Sunday 13 May, 2012.

Related Content

  • Indonesia toll road project starting soon
    January 14, 2019
    Work will commence soon on Indonesia’s South Cikampek II-Jakarta toll road project. The 64km highway project is benefiting from funding from the Bank Negara Indonesia, Bank Central Asia, and Bank Mandiri. These have each contributed US$91.06 million. In all, the project is costing $970 million. The project is being managed by Indonesian firm Jasamarga Japek Selatan.
  • New bridge is spanning China’s Yangtze River
    June 28, 2013
    There is massive development in design and construction of bridges in China and the Yingwuzhou Bridge over the Yangtze River is one key project – Mike Woof reports, with assistance from Route One’s Chinese publishing partner *CMTM Called the Mother River, the Yangtze is a focal point for China politically, economically and culturally. The river has been at the heart of China’s development for millennia, its history stretching back as far as the dawn of human civilisation. The name Yangtze, or Yangzi, is its
  • A wheely great bridge for the English city of Hull
    November 6, 2019
    A 60m pre-constructed pedestrian bridge weighing 150 tonnes as been wheeled into position over the A63 in the northern English city of Hull. The covered and vaulted Princess Quays Bridge will be renamed when it opens in the spring enabling pedestrians and cyclists to cross over the busy dual carriageway. The positioning operation meant that first the route was cleared of signage, guardrails and street lights. The bridge was then lowered onto two wheeled transporters – one at each end of the structur
  • Work on St Petersburg bridge project
    June 20, 2016
    Contractor ICA Construction used two Aquajet robotic hydrodemolition machines at the top of a 120m-high bridge pylon located in the city of St Petersburg. The two Aquajet robotic water cutters were used to remove surplus concrete from around the inner steel structure of the bridge pylon. This link spans the River Neva and forms part of the Western High-Speed Diameter (WHSD) route in St Petersburg. The WHSD is a highly important route for the region and will provide a key connection between the Scandinavi