Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Construction materials and road design in East Africa
    June 25, 2013
    An envisaged shortage in the supply of angular rock or crushed stone in Tanzania and a determination to conserve the environment by Kenyan authorities dictated the engineering design of a multi-national road linking the two largest economies in Eastern Africa. Shem Oirere reports The cost of buying crushed stone or hiring a site for mining the material and the expenses of moving it from the crushing site to the project area, saw designers opt for an intermediate alignment and discarding of the inner and out
  • Virginia highway project awarded to joint venture
    November 7, 2017
    A major highway project in the US state of Vriginia has been awarded to a joint venture team comprising Granite Construction, Parsons Corporation, and Corman Construction. The firms will handle the Interstate 64 (I-64) Southside Widening and High Rise Bridge, Phase 1 design-build contract, which was awarded by the Virginia Department of Transportation. Construction work for the US$410 million joint venture project is scheduled to commence in November 2017 and should be completed in July 2021.
  • COWI wins Massey Tunnel design contract
    February 18, 2022
    COWI will develop an eight-lane immersed tunnel for the George Massey Crossing Project near Vancouver, Canada.
  • Key SR-91 highway upgrade underway in California
    December 16, 2013
    In the US state of California, construction is now underway for the State Route 91 (SR-91) Corridor Improvement Project. This improved section for SR-91 will run through the Corona and Riverside, both of which are located in Riverside County. The project will extend the SR-91 Tolled Express Lanes in Orange County into Riverside County, a distance of 17.6km. This includes a 13km stretch into Riverside County on SR-91, with a 5km flyover connecting to Interstate 15 from SR-91. Riverside County Transportation