Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Russian road deals
    June 25, 2012
    The new eastern bypass for Khabarovsk in Russia is being discussed by the local authorities. The 30km highway will feature four lanes and will connect the Chita–Khabarovsk (M-58) and Khabarovsk–Vladivostok (M-60) highways. It will also link with roads in the city at nine interchanges. The highway will have a speed limit of 140km/h. The project will be run on a public–private partnership basis and will cost US$540million. The government will provide 20–25% of the finances required, with the rest coming from
  • India’s longest road tunnel continues apace with Atlas Copco support
    May 20, 2014
    The challenging construction of India’s largest road tunnel is part of a vital US$500 million project aiming to connect the isolated northern state of Jammu and Kashmir with the rest of the vast and highly populated country. Guy Woodford reports Travelling on National Highway 1A (NH 1A) in northern India should be the dictionary definition of ordeal. The single lane, narrow and winding road crosses some of the steepest, most treacherous terrain on the planet. The arduous route becomes especially difficult t
  • Qatar’s new highway requires huge logistics operation
    October 26, 2016
    In the Middle East nation Qatar, a large-scale highway project is underway that will make significant improvements for vehicle capacity and cut journey times for drivers. The new route will also improve transport connections between Qatar’s ports and neighbouring Saudi Arabia. At the same time, the new highway will carry much of the heavy vehicle traffic travelling between the two countries.
  • Bridge design using flow modelling techniques
    February 17, 2012
    SBG has set numerous engineering precedents with its hugely innovative Jamarat Bridge project in Saudi Arabia