Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Out of sight
    July 16, 2012
    With traffic volumes increasing around the world, many existing road links will need to be upgraded or replaced in coming years The need for new road tunnels is particularly intense in many dense urban areas, due to environmental requirements that mean new road links will have to be installed underground. However, improving existing road tunnel links is providing a very large part of the business for this specialised construction segment at present.
  • Costly bridge link
    May 30, 2012
    Costs are climbing for the proposed new bridge to link Denmark and Germany. The structure is now expected to cost €282 million. This represents a significant increase from the €192 million estimated just 18 months ago. Meanwhile the cost of the environmental permit has also doubled.
  • Road and bridge upgrades improving transport in Nepal
    November 1, 2019
    New road and bridge upgrades are being introduced in Nepal that will help improve transport and develop the country’s economy.
  • EIB aids funding for Poland's A2
    July 12, 2012
    The European Investment Bank (EIB) will help funding of the A2 highway project in Poland, which has faced financing problems due to the economic crisis. The EIB is making an exception to its usual policy by granting to Polish company Autostrada Wielkopolska credit that covers over 50% of the costs of the construction work for a highway section. The EIB will provide €1 billion for the A2 investment and to create an option of an additional €200 million. The total value of the investment, which is expected to