Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Colombia’s tunnel of woe faces further setback
    May 19, 2017
    The troubled tunnel construction project in Colombia to build the La Linea link has faced yet a further setback in its long tale of woe. The tender for the completion of the final 12% of the tunnel project has not managed to attract any interest from contractors. The budget for this work is an estimated US$77 million. A new tender process is being launched, with a submission deadline of 6th June 2017 and planned winner announcement on 4th July 2017. The contractor that had been building the tunnel failed to
  • Nepal highway project now moving forward again
    March 20, 2015
    The Nepalese Government is now moving forward with its plans for the Kathmandu-Tarai Fast Track highway project. The Indian firm Infrastructure Leasing & Financial Services (IL&FS) has been awarded the contract to prepare a detailed project report (DPR) for the project. Following earlier issues with regard to sourcing suitable financing, the Nepalese Government now plans to construct the highway link using the Public-Private Partnership (PPP) and build-own-operate-transfer (BOOT) model. The maximum cost of
  • Funding for Washington-Oregon bridge project
    May 15, 2023
    A funding plan is proposed for the new Washington-Oregon bridge project.
  • Multi-million dollar investment in Indonesian road toll projects
    July 12, 2012
    Millions of US dollars are being poured into new and expanding toll road projects in Indonesia. Wijaya Karya (Wika), the Indonesian government-owned construction service provider, will build toll roads linking Kedung Badak to Kedung Halang and Pandaan to Gempol in Bogor through two contracts worth US$36.35million (IDR 340.80bn) and US$23.98million (IDR 225bn), respectively. Awarded by highways operator Jasa Marga (JSMR), the contracts require the roads completion in 18 months.