Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Australian state government does a deal with East West Connect
    April 15, 2015
    The state government of Victoria in Australia will pay the East West Connect consortium US$258 million to cancel construction of Melbourne’s East West Link road tunnel. The payoff is to cover the consortium's bidding, design and pre-construction costs and draw a line under the deal that has been mired in financial controversy for years. The federal government slammed Victoria’s decision to bail out of the project as “an obscenity’’ that will cost 7000 jobs, according to a report in The Australian news
  • Colombia connectivity to improve with new bridge
    February 2, 2017
    Construction work on Colombia’s landmark Yati-Bodega bridge is already 50% complete. The 2.3km Puente de la Reconciliacion Bridge spans the Magdalena River and when complete, will be the longest in the country. The project is challenging however, due to the river’s flow rate as well as the underlying geology. Once the bridge opens to traffic, it will connect the municipality of Mompox with the rest of Colombia’s Bolivar department. At present Mompox and Magangue are difficult to reach by road due to the lac
  • India’s capital highway project will improve transport connections
    October 10, 2017
    Huge numbers of construction machines as well as plant and equipment are working overtime, backed by mammoth manpower, to meet the targeted completion deadline of March 2018 for India’s Eastern Peripheral Expressway (EPE). The 135km arterial route is being built with six lanes and surrounds India’s National Capital, Delhi, its National Capital Region (NCR) and the industrially developed North Indian states of Haryana and Uttar Pradesh.
  • Malaysia highways being built
    January 13, 2016
    Construction work for three new highways will commence in Malaysia’s Penang State by June 2016. The work will help reduce congestion in Penang State. The first of the three highways to be built will be the Air Itam-Tun Dr Lim Chong Eu Expressway bypass. This project is being carried out by Malaysia-based Consortium Zenith BUCG. Meanwhile plans are also in hand to construct the Setiawangsa-Pantai Expressway (SPE) in Malaysia. The project is expected to cost US$845.6 million. The SPE link should be open to t