Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Colombia: Toyo Tunnel award to be made in September
    July 15, 2015
    The contract award for Columbia’s 9.75km Toyo Tunnel project will be made on September 28, according to Columbian media. The tunnel, costing almost US$760, will be part of a new 39km road between Santa Fe de Antioquia and Canasgordas. World Highways reported in January that the central government will contribute $216 million towards the project, the regional government of Antioquia department will contribute $337 million and the Medellin city government will pitch in with $212 million. Columbia’s N
  • Strong interest for major highway concessions in Colombia
    June 6, 2013
    Interest is said to be strong for the Pacífico 1, Pacífico 2 and Pacífico 3 highway concession projects in Colombia. At present the country’s national infrastructure agency, ANI, has 56 expressions of interest for the three highway concessions in Antioquia Department. The projects feature a total estimated investment of US$2.16 billion.
  • Environmental solutions for tomorrow's roads
    August 2, 2012
    Leading the change, IRF organises its 2nd Conference on Roads & Environment in Geneva, Switzerland on 10-11 November 2008 An opinion poll in the UK at the end of June showed that more people think their government should first try to tackle environmental issues before trying to tackle global economic problems. Two-thirds of people were even in favour of green taxes, either now or when economic conditions improve. The environment remains high on the agenda in most countries, including in those where public o
  • £495 million National Highways specialist contract
    July 1, 2025
    A £495 million National Highways specialist engineering advice contract has been awarded.