Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Tenders being opened in Brazil for highways and tunnel projects
    February 6, 2014
    A series of major project tenders are opening in Brazil. The Brazilian Government has announced five new road tenders to be launched in 2014. The highway sections run for a total distance of some 2,625km. This programme of works will lengthen the country’s highway network by some 2,282km, with the work costing an impressive US$7.39 billion in all. The roads include the BR-163, BR-364 and BR-153 in the Central West region, and the BR-476 stretch in the South, in addition to the Rio-Niteroi Bridge in Rio de J
  • Road transport key to Africa's trade links
    February 17, 2012
    Road transport is the key to improving Africa's links within its own territory, and further afield as Patrick Smith reports. Development of road transportation is the key to the future of the African economy, and countries on the continent are making great strides. According to a report by a transport infrastructure expert at the New Partnership for Africa's Development (NEPAD), within the next 15 years the value of trade in Africa could reach US$250 billion if a $32 billion investment is made to integrate
  • Diamond in the Pearl: China’s Hong Kong-Zhuhai-Macao Bridge complex
    March 8, 2018
    People in the Pearl River Delta are celebrating the Chinese New Year with the imminent opening of the Hong Kong-Zhuhai-Macao Bridge. David Arminas reviews progress. China’s Spring Festival, or Lunar New Year, is celebrated with the usual enthusiasm and spectacular fireworks. But celebrations will be particularly joyous for many people in the southern Pearl River Delta. The soon-to-be-open Hong Kong-Zhuhai-Macao Bridge (HZMB) will slash travel time between the Hong Kong Special Administrative Region, Zhuh
  • New Moscow highway project planned
    September 10, 2019
    A new highway project is being planned to improve transport links to and from Russia’s capital, Moscow. The 16km route will connect Vinogradovo, Boltino and Tarasovka featuring two lanes in either direction. The link will feature six bridges and overpasses and is expected to carry from 24,600-33,800 vehicles/day. The route will be managed by the Fourth Concession Company following an agreement with the Gazprom Bank. Construction should be complete by 2022, with the project worth over US$375 million and the