Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • A new highway is planned connecting Turkey with Romania through Bulgaria
    May 24, 2012
    Discussions are now underway on a new highway to connect Turkey with Romania. A major stretch of this new highway will run through Bulgaria, which will provide a much-needed link in the country as it has insufficient express road infrastructure at present. The Bulgarian section of the highway would run from Ruse to Svilengrad. The political leaders of Bulgaria and Turkey, as well as Qatar, have been in discussions over the proposed project
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • ARTBA PPP awards include key Texas project
    July 22, 2014
    A $1.2 billion highway project in North Central Texas was recognised as a prime example of innovative transportation financing at an event held by the American Road & Transportation Builders Association (ARTBA). The 26th Annual Public Private Partnership (P3) Conference in US capital Washington was organised by ARTBA with its P3 Awards being presented in two categories, for entrepreneur of the year and project of the year. The former is given to at least one individual who has made an outstanding contributi
  • Bolivia is investing in road programme
    July 1, 2015
    Plans are in hand in Bolivia for 10 road projects. The state-owned road operator ABC has started the projects, which involve investments of more than US$588 million and extend for over 493km. China Harzone Industry Corporation is handling the $66.1 million project to develop the 38.06km Final Avenida Petrolera-Paracaya scheme in Cochabamba. Sinopec International signed the deal for the 58.8 km Puente Yapacani-Puente Ichilo project. Other projects include the 59km Lluchu-Ravelo road (linked to Santa Fe), whi