Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Major firms are offering key diesel developments
    September 26, 2013
    New diesel developments from JCB and Volvo Innovative diesel technologies are being developed by all the major engine manufacturers at present. New emission requirements have pushed the boundaries in terms of technology, with all the firms working on new systems to ensure their products meet requirements. And companies are also developing new engine sizes to broaden their range of offerings to the market.
  • Weigh-in-motion key to maximising road life
    February 24, 2012
    The market and technology for weigh-in-motion systems continues to evolve – Mike Woof writes. for both mature and developing highway infrastructure networks, traffic densities play an important role in determining road wear and life. Monitoring traffic volumes and individual vehicle weight is crucial for ensuring roads can cope in the long term and that maintenance can be planned, while the problem of overloading can be eliminated.
  • New tunnel connection for Mexico
    November 8, 2017
    A major tunnel construction project has been carried out in Mexico, setting a technological precedent for Latin America . Mexican materials giant CEMEX took part in the construction of the Coatzacoalcos Underwater Tunnel in Veracruz, Mexico. This innovative project features large tunnel bores and utilised a complex construction process. As a result of these technical challenges CEMEX was required to design and deliver special concretes so as to allow the construction of the different structures needed to
  • Bolivian project moving forward
    February 24, 2012
    Bolivia's 306km Villa Tunari-San Ignacio de Moxos road is due for completion in 2014. The new road will provide and important link for the departments of Beni and Cochabamba