Skip to main content

Increasing costs of highways project delays

Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s
May 15, 2012 Read time: 1 min
Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain.

The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment stages.

The new link will be run and managed by concession company 1550 Tabasa, which currently operates the Vallvidriera tunnels.

Tabasa will finance much of the work through its own sources although the link will be tolled which will help provide cash flow once it is constructed.

Related Content

  • Costs climb for Messina bridge in Italy
    February 24, 2012
    The cost of the Strait of Messina bridge looks set to climb from original estimates.
  • US$1.3 billion Chilean road tender delayed
    June 19, 2024
    The tender for a US$1.3 billion Chilean road project is being delayed.
  • Myanmar bridge construction project underway
    February 18, 2019
    Construction work is underway on the new bridge spanning the Bago River in Myanmar. Much of the funding for the 1,928m bridge is being provided by the Japan International Cooperation Agency (JICA) in the form of a loan worth US$272.6 million. It is expected to cost $289 million in all to build, with completion expected in 2023. The bridge connects Thanlyin with Yangon’s Thaketa Township area and is being built just 125m from the existing bridge over the Bago River. This new cable-stayed structure will help
  • BESIX-MTH awards Nordhavn work to Bravida
    February 5, 2024
    Bravida Denmark, on behalf of the BESIX-MTH joint venture, will install plumbing, electricity, ventilation, road lighting and light signals for Copenhagen’s Nordhavn Tunnel.