Skip to main content

Houston’s US$13 billion ‘gamechanger’ highway

Work is underway on Houston’s US$13 billion ‘gamechanger’ highway project.
By MJ Woof October 28, 2024 Read time: 2 mins
Houston in Texas will benefit from a massive highway upgrade project – image courtesy of © Sean Pavone| Dreamstime.com


Construction work has started on the US$13 billion I-45 expansion project near Houston in Texas. The project has been described as a ‘gamechanger’ for the city by the Texas Department of Transportation (TxDOT).

The work is being managed jointly by TxDOT in partnership with the city of Houston, Harris County and the Harris County Flood Control District. According to TxDOT, the I-45 North Houston Highway Improvement Project (NHHIP) is designed to expand roadway capacity, reduce congestion, improve safety, and enhance mobility along I-45 from I-69 to Beltway 8 North. It also includes rebuilding downtown Houston’s freeway system, which covers I-45, I-69, I-10, and SH 288. A key element is rerouting I-45 to run parallel with I-69 and I-10 through downtown Houston.

The work will take until 2042 to complete. TxDot also says that the I-45 NHHIP will address current population growth and also lays a foundation for the region’s sustainable development. The project targets congestion relief, improves evacuation routes, and promotes multimodal transportation options.

TxDOT says that the first phase, Segment 3B-1, will focus on stormwater management with the installation of box culverts to direct stormwater to detention ponds, enhancing flood resiliency. St. Emanuel Street will serve as a feeder road for this portion of I-45. This phase, expected to be completed by 2027, has a budget of $121 million. Following this, Segment 3B-2, set to begin in January 2025 and expected to be completed by 2030, will focus on constructing new mainlanes, frontage roads, and enhanced bike and pedestrian infrastructure on I-69 between SH 288 and I-45. The estimated cost for Segment 3B-2 is $695.5 million.


 

 

 

 

For more information on companies in this article

Related Content

  • First section of new Texas route opening
    November 21, 2017
    The first stretch of a highway development project in Texas is now open. New southbound toll lanes have been built for the Texas 288 project, running between downtown Houston and the Brazoria County line. The existing southbound traffic is being shifted to these lanes on a temporary basis between Holly Hall and Loop 610. But drivers are not being tolled at present. The US$815 million work is due for completion in 2019, when the tolling system will come into full use. The project involves widening the route
  • Atkins is working on major deals for Texas and Florida
    March 10, 2014
    Atkins is working on major contracts in Texas and Florida for tolling and design and build services respectively. In Texas the Department of Transportation (TxDOT) reselected Atkins as its state-wide prime consultant for toll-plaza planning, development, and implementation. Under the terms of the five-year, $10 million contract, Atkins is providing planning, development, infrastructure design and coordination, and construction oversight services, as well as system installation, integration, and testing serv
  • US$1.27 billion Vietnam transport infrastructure works proposed
    August 29, 2024
    Transport infrastructure works worth almost US$1.27 billion are being proposed for Vietnam.
  • $131 million St Louis road upgrade planned
    May 26, 2025
    A $131 million road upgrade is planned for St Louis.