Skip to main content

Goldhofer’s flexible construction friends

Making their debut at INTERMAT, German firm Goldhofer will be presenting its range of THP/SL heavy-duty modules as well as its flexible XLE 6 compact system.
January 6, 2017 Read time: 2 mins
Goldhofer’s XLE 6 compact system and THP/SL range of heavy-duty modules are said to be highly flexible for client construction equipment transport needs.
Making their debut at INTERMAT, German firm 1449 Goldhofer will be presenting its range of THP/SL heavy-duty modules as well as its flexible XLE 6 compact system.

Said by the company to offer a flexible and economical construction-related transport solution, the THP/SL range achieves an optimal ratio between axle loads up to 45tonnes and low unladen weight. The twin-tyre heavy-duty modules are said to be suitable for use off-road thanks to their high axle compensation. The swing axles are equipped with a hydraulic axle compensation system for levelling, and the hydro-mechanical all-wheel force-steering system is designed as a twin-circuit system. The modular system can be coupled either longitudinally or transversely and is said by Goldhofer to be fully compatible with the other THP systems.

With the XLE 6, Goldhofer says it is introducing a genuine multi-use trailer for various types of construction machinery in Paris. The six-axle version enables the XLE to handle heavy-weights with a payload of around 80,000kg. The 950mm wide excavator recess is said to enable the stowage of large excavator arms to lower the transport height of the machine.

A newly developed rear bridge is said to provide an extremely long extension length combined with low net weight and low overall height. The patented Goldhofer extension system is said by the company to allow haulage firms a short overall length for empty travel, and an elongated loading bridge when necessary. Boasting a steering angle of 60° and swing axles of up to 600mm, the XLE 6 is said to offer excellent steering and manoeuvrability. It can be operated with a total combination length of 23metres without a co-driver (German regulations).

"Intermat is one of the world's most important trade shows for the construction industry. As a global player in transport logistics for the heavy-duty sector, we were determined to be there," says Stefan Fuchs, Goldhofer’s chairman.

%$Linker: External 0 0 0 oLinkExternal www.goldhofer.de Goldjofer false http://www.goldhofer.de/ false false%>

Outside: E2 Stand: C024

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • INTERMAT reveals Mobilmix plant from Liebherr
    January 6, 2017
    Mobilmix 2.5 is a container-mounted mixing plant system developed for large construction sites. With an hourly capacity of 110 cubic metres of compacted concrete, the plant’s components are housed in modular containers that can be easily transported and linked together on-site.
  • INTERMAT reveals Mobilmix plant from Liebherr
    February 7, 2012
    Mobilmix 2.5 is a container-mounted mixing plant system developed for large construction sites. With an hourly capacity of 110 cubic metres of compacted concrete, the plant’s components are housed in modular containers that can be easily transported and linked together on-site.
  • Putzmeister adds five-section pump
    January 6, 2017
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Putzmeister adds five-section pump
    April 19, 2013
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als