Skip to main content

Goldhofer’s flexible construction friends

Making their debut at INTERMAT, German firm Goldhofer will be presenting its range of THP/SL heavy-duty modules as well as its flexible XLE 6 compact system.
January 6, 2017 Read time: 2 mins
Goldhofer’s XLE 6 compact system and THP/SL range of heavy-duty modules are said to be highly flexible for client construction equipment transport needs.
Making their debut at INTERMAT, German firm 1449 Goldhofer will be presenting its range of THP/SL heavy-duty modules as well as its flexible XLE 6 compact system.

Said by the company to offer a flexible and economical construction-related transport solution, the THP/SL range achieves an optimal ratio between axle loads up to 45tonnes and low unladen weight. The twin-tyre heavy-duty modules are said to be suitable for use off-road thanks to their high axle compensation. The swing axles are equipped with a hydraulic axle compensation system for levelling, and the hydro-mechanical all-wheel force-steering system is designed as a twin-circuit system. The modular system can be coupled either longitudinally or transversely and is said by Goldhofer to be fully compatible with the other THP systems.

With the XLE 6, Goldhofer says it is introducing a genuine multi-use trailer for various types of construction machinery in Paris. The six-axle version enables the XLE to handle heavy-weights with a payload of around 80,000kg. The 950mm wide excavator recess is said to enable the stowage of large excavator arms to lower the transport height of the machine.

A newly developed rear bridge is said to provide an extremely long extension length combined with low net weight and low overall height. The patented Goldhofer extension system is said by the company to allow haulage firms a short overall length for empty travel, and an elongated loading bridge when necessary. Boasting a steering angle of 60° and swing axles of up to 600mm, the XLE 6 is said to offer excellent steering and manoeuvrability. It can be operated with a total combination length of 23metres without a co-driver (German regulations).

"Intermat is one of the world's most important trade shows for the construction industry. As a global player in transport logistics for the heavy-duty sector, we were determined to be there," says Stefan Fuchs, Goldhofer’s chairman.

%$Linker: External 0 0 0 oLinkExternal www.goldhofer.de Goldjofer false http://www.goldhofer.de/ false false%>

Outside: E2 Stand: C024

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • JCB is boosting range of asphalt rollers with compact models
    April 12, 2012
    JCB is broadening its range of asphalt compactors with the addition of the VMT380 and VMT430 models. These are said to offer high operator visibility, comfort, safety and performance in comparison with other models on the market, according to the firm. Tapered frames ensure good sightlines while both models are powered by 2.2litre Kohler diesels mounted in the front chassis section and rated at 34.6kW, with large fuel and water tanks that are said to be class leading. A novel feature is said to be the trave
  • Daemonator says ‘I’ll be back…’
    January 6, 2017
    The Daemonator struck fear into the hearts of its competitors during INTERMAT, according to Won-Hae Lee, chairman of Korean attachment firm Daemo Engineering. Complete with flashing lights and intimidating electronic voice, the attachment-wielding 2.4m high robot, modelled loosely on a Transformers character, uses Daemo’s hammers, shears, compaction plates and grabs as part of its construction.
  • Daemonator says ‘I’ll be back…’
    April 20, 2012
    The Daemonator struck fear into the hearts of its competitors during INTERMAT, according to Won-Hae Lee, chairman of Korean attachment firm Daemo Engineering. Complete with flashing lights and intimidating electronic voice, the attachment-wielding 2.4m high robot, modelled loosely on a Transformers character, uses Daemo’s hammers, shears, compaction plates and grabs as part of its construction.
  • Peri premiere’s PROKIT EP 110 at INTERMAT 2012
    January 6, 2017
    Peri is unveiling its new safety system for building shells at INTERMAT 2012. The PROKIT EP 110 is 1.10m high, quickly mounted temporary protection for open slab edges on building shells.