Skip to main content

Gloucester lift bridge is opened

The newly-opened High Orchard Bridge in Gloucester, south-west England, links the city's inner relief road to the new south-west bypass and provides access to the massive Gloucester Quays €293.5 million redevelopment scheme. The lift bridge structure was designed and constructed under a joint venture involving English Partnerships, British Waterways and developer Peel Holdings. The €11.74 million structure is a contemporary single-span bridge, with an efficient electro-hydraulic movable, 300tonne lifting d
July 12, 2012 Read time: 1 min
The newly-opened High Orchard Bridge in Gloucester, south-west England, links the city's inner relief road to the new south-west bypass and provides access to the massive Gloucester Quays €293.5 million redevelopment scheme.

The lift bridge structure was designed and constructed under a joint venture involving English Partnerships, British Waterways and developer Peel Holdings. The €11.74 million structure is a contemporary single-span bridge, with an efficient electro-hydraulic movable, 300tonne lifting deck.

DavyMarkham was contracted by civil engineering contractors Alun Griffiths to design and manufacture the mechanical, hydraulic and electrical elements of the bridge, notably the main pivot bearings, the deck operating system, tail locking assemblies and electrical control equipment. The bridge deck, supplied separately by structural steelwork company Rowecord, measures 28m long by 16m wide and weighs around 200tonnes, with an additional concrete and steel 100tonne counterweight in the tail section.

Related Content

  • New crushing and screening developments abounded at Hillhead
    October 3, 2014
    A wide array of crushing, screening and materials handling technologies have been introduced in recent months - Mike Woof writes The manufacturers of crushing and screening products have been developing an array of new systems to optimise production. The recent Hillhead show in the UK was the launch point for a number of these new products, although firms from all over the world have also been developing new designs. Productivity and wear life are two performance factors seeing major benefits from innovatio
  • Terex built for bridge paving
    November 29, 2012
    To meet a need to carry out complex modern bridge designs, the Terex Bid-Well 3600 paver is available with truss transition inserts, increasing maximum paving width from 27.4-33.5m. The inserts adjust truss depth from 914-1219mm toward the paver’s centre, reducing frame deflection and this is said to increase surface profile smoothness. Offering paving widths from 4.6-33.5m with optional transition inserts, the 3600 gives companies more versatility for paving a wide variety of bridge designs, including mult
  • Safe and productive crushing with new jaw crusher
    March 15, 2012
    Metso continues to broaden its crushing equipment range with the addition of the latest C-Series jaw crusher. The C120 is said to offer reliability, crushing efficiency and versatility in both stationary and mobile applications. Described by Metso as safe and easy to use, the C120 is also said to be durable and user-friendly.
  • Safe and productive crushing with new jaw crusher
    March 15, 2012
    Metso continues to broaden its crushing equipment range with the addition of the latest C-Series jaw crusher. The C120 is said to offer reliability, crushing efficiency and versatility in both stationary and mobile applications. Described by Metso as safe and easy to use, the C120 is also said to be durable and user-friendly.