Skip to main content

German highway upgrade

Construction work is due to start soon in south Germany on the upgrades to 41km of the A8 autobahn at a cost in the order of e305 million. Work will include widening the road to six lanes between Augsburg-West and Neu-Ulm. The project is being carried out under the public private partnership (PPP) model, and is due for completion in September, 2015.
May 10, 2012 Read time: 1 min
Construction work is due to start soon in south Germany on the upgrades to 41km of the A8 autobahn at a cost in the order of €305 million. Work will include widening the road to six lanes between Augsburg-West and Neu-Ulm. The project is being carried out under the public private partnership (PPP) model, and is due for completion in September, 2015.

Related Content

  • Design for Russian ring road
    June 14, 2012
    Design work is underway for the first section of the St Petersburg ring road in Russia, and work will be carried out from Gorskaya to Primorskoe in 2013 at a cost of some US$373million. The 24km road will be widened to six lanes and the road structure will be revamped with completion scheduled for 2015.
  • Testing and striping underway for Seattle’s Alaskan Way tunnel
    October 18, 2018
    Crews have been working flat out on the Alaskan Way Tunnel in Seattle to install and test thousands of components and 90 interconnected systems.The client, Washington State Department of Transportation, said that Seattle Tunnel Partners began installation inside the double-deck State Route 99 tunnel in March after crews completed construction of the upper and lower roadways. STP said that testing could be complete by late September and the tunnel could open as soon as this fall after an approximate three-w
  • Nepalese highways will benefit from Chinese funding
    October 11, 2012
    The Chinese Government is providing neighbouring Nepal with expertise and funding for the ring road development around capital Kathmandu. This has been arranged through a bilateral agreement between the Chinese and Nepalese governments. The programme of works is getting under way and will see the widening of 27km of the ring road from its present four lanes to eight lanes in all. The Chinese Government funded the detailed survey design although the contractor has yet to be selected for the project.
  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load