Skip to main content

French highway package

A new PPP deal has been signed in France for the financing, design, construction, service and maintenance on a 15-year land-use bypass road southwest of Vichy.
March 1, 2012 Read time: 1 min
A new PPP deal has been signed in France for the financing, design, construction, service and maintenance on a 15-year land-use bypass road southwest of Vichy. The agreement was signed by various bodies including 184 Colas Rhône-Alpes Auvergne, 3470 DTP Earthworks, 979 Bouygues Travaux Publics Regions France and SEIEF/CSO EPI2 and Investment. The project will be done by a construction consortium comprising Colas Rhône-Alpes Auvergne, agent (34%), Bouygues Travaux Publics Regions France (33%) and DTP Earthwork (33%). The work is for an 18km,two-lane road over a length and will include 16 roadside works of art and is worth some €54 million. The project is expected to commence in March 2012 and will last 18 months. The 15 year maintenance deal will be carried out by Colas Rhône-Alpes Auvergne for pavements and road equipment, and Regions in France Bouygues Travaux Publics for works of art.

For more information on companies in this article

Related Content

  • Russian road deals
    February 24, 2012
    A notable partnership deal looks set to provide funding for key Russian highway projects. A memorandum of co-operation has been signed between the state-owned Russian Highways (Avtodor) and the European Bank for Reconstruction and Development (EBRD).
  • THIS is a Paving Project– The I-15 CORE
    December 20, 2012
    Provo, Utah – The scope of the I-15 Corridor Expansion Project (I-15 CORE) in the state of Utah is nearly unprecedented because of the size of the project and the short completion deadline. Twenty-four miles (38.6 km) of removal and replacement of Interstate 15 between Lehi and Spanish Fork, widening the number of traveling lanes by two, for up to six lanes in each direction in 35 months. The new 364 lane miles (586 km) of concrete roadway will be slipformed 12 or 12.5 inches (305 or 318 mm) thick for a tot
  • Key projects free up Auckland's congested motorway network
    June 14, 2012
    A number of key projects in Auckland, New Zealand will free-up the city’s congested motorway network - Mary Searle reports.Auckland is a sprawling city, home to 1.4 million people, one third of New Zealand’s total population. Until recently, greater Auckland comprised Auckland city, North Shore city over the harbour bridge to the north, Waitakere city to the west and Manukau city to the south. An amalgamation of these various cities’ councils, plus the regional council and three district councils into one,
  • Tensar’s route to Euro 2012
    July 20, 2012
    Tensar International’s TriAx design solution has been used in the sub-base for the 17.9km Gdansk bypass in Poland. TriAx is said to be helping to combat the differential settlement across the poor soil of the Wistula river delta and to minimise frost heave caused by Poland’s severe winters. TriAx is said to be helping to combat the differential settlement across the poor soil of the Wistula river delta and to minimise frost heave caused by Poland’s severe winters.