Skip to main content

Extending the life of road assets

In an opinion piece published by the IRF, Matthew Jordan-Tank, head of infrastructure policy and IPPF, European Bank for Reconstruction and Development (EBRD) has explained that extending the functional life of road assets can be achieved using performance-based contracts. In most developing and merging market economies, roads require rehabilitation, or even reconstruction, many years prior to the expected date. Simply put: usable life is not equal to design life, and it is not uncommon to find that a ro
April 7, 2017 Read time: 2 mins
RSSIn an opinion piece published by the 3918 IRF Washington, Matthew Jordan-Tank, head of infrastructure policy and IPPF, European Bank for Reconstruction and Development (EBRD) has explained that extending the functional life of road assets can be achieved using performance-based contracts.

In most developing and merging market economies, roads require rehabilitation, or even reconstruction, many years prior to the expected date. Simply put: usable life is not equal to design life, and it is not uncommon to find that a road must be rehabilitated only halfway into its estimated original asset duration. While harsh climate conditions with large seasonal temperature changes may play a role, much of this 'premature' investment boils down to lack of systematic maintenance that is normally applied in countries with regular 'asset management' funding regimes.

Applying performance-based maintenance contracting to the road sector can produce significant fiscal improvements, as well as user benefits in the form of better maintained and therefore safer roads.

EBRD recently published a paper providing a condensed yet substantive overview of the key international lessons learned in the area of performance-based contracts.

For more information on companies in this article

Related Content

  • Advances in asphalt testing
    August 31, 2012
    The latest asphalt testing equipment brought onto the market is both innovative and highly accurate as Kristina Smith reports Advanced pavement design requires advanced test equipment. And advanced test equipment takes time and money to design, engineer and produce. But if your expensive testing machine could perform a few more tricks, buying one would make financial sense to more organisations. This is the thinking behind IPC Global’s new Uniaxial Fatigue Test Kit for its Asphalt Performance Mixer Tes
  • Paul Verrico of Eversheds will be headline speaker at ERIC 2016
    August 9, 2016
    Despite Europe being a global leader in road safety, around 25,000 road users (working, walking, driving or riding a bicycle) did not make it home in 2015 and more than 200,000 others sustained life-changing or serious injuries. Leading Safety Lawyer Paul Verrico, a Partner of European law firm Eversheds will present the ERICLeeds16 ROAD SAFETY DEBATE. He will argue that organisations in the UK face ever increasing sanctions through new sentencing guidelines for health and safety and corporate manslaugh
  • ASECAP: Cooperation needed for better toll-road risk management
    May 31, 2017
    Toll operators must offer a level of service for which drivers are prepared to pay because in many cases, drivers have alternative free-use routes. Incentives to attract drivers onto toll roads must include shorter and reliable journey times as well smooth and trouble free travel – all at an affordable price. Private companies running toll roads face the same difficulties as any other commercial entity, in particular financing construction before any toll revenue can be collected. Hardly surprising that fin
  • ASECAP: Cooperation needed for better toll-road risk management
    May 31, 2017
    Toll operators must offer a level of service for which drivers are prepared to pay because in many cases, drivers have alternative free-use routes. Incentives to attract drivers onto toll roads must include shorter and reliable journey times as well smooth and trouble free travel – all at an affordable price. Private companies running toll roads face the same difficulties as any other commercial entity, in particular financing construction before any toll revenue can be collected. Hardly surprising that fin