Skip to main content

E&E Event 2018 Berlin: an asphalt industry fit for purpose

Exhibition space is now sold out for the E&E Event 2018 – Euroasphalt & Eurobitume - coming to Berlin, June 14-15. But early registration for a discount is still available, however the deadline is fast approaching – April 16. The finalised programme will soon be published for the E&E Event 2018 that will focus on the preparations needed by the asphalt industry to ensure it is fit for purpose in the future.
April 3, 2018 Read time: 2 mins
The 100-year-old architectural delight of Berlin’s Wasserwerk, now an event and networking venue that will be part of the E&E Event 2018 in June
Exhibition space is now sold out for the E&E Event 2018 – Euroasphalt & Eurobitume - coming to Berlin, June 14-15.


But early registration for a discount is still available, however the deadline is fast approaching – April 16.

The finalised programme will soon be published for the E&E Event 2018 that will focus on the preparations needed by the asphalt industry to ensure it is fit for purpose in the future.

Important strategic issues will be explored, some of which were highlighted in the E&E Congress 2016. These include the increasingly stringent economic aspects of supply and demand, the growing environmental issues over highway construction and use, health and safety within the sector and, as ever, the latest technologies and equipment.

The facilitator will again be Katrina Sichel, back moderating after leading the successful E&E Event 2016. This year’s event will be based on a completely new format. The programme will be centred around a series of professionally-facilitated sessions using debates, workshops and information exchanges, supported by online tools that allow attendees to have their own say.

Attendees will hear about road financing initiatives, the European Union’s Eurovignette Directive as well as ideas on who pays and for what. The latest low-rolling resistance asphalt will be examined, along with more sustainable pavements and how to reduce CO2 emissions along highways.

The venue is Vienna House, Andel’s Berlin and a networking dinner - included in the registration fee – will be held within the historical industrial architecture of the 100-year-old pumping station, Wasserwerk Berlin. More information about Wasserwerk Berlin can be found at the website: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.wasserwerk-berlin.de false http://www.wasserwerk-berlin.de/ false false%>

For more information to register for the early-bird discount, visit the E&E Event 2018 website: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.eeevent2018.org false http://www.eeevent2018.org/ false false%>

Related Content

  • More efficient ground stabilisation with the Allu 3D Positioning System
    January 6, 2017
    The Allu 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer. The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit. Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in
  • More efficient ground stabilisation with the Allu 3D Positioning System
    April 19, 2013
    The Allu 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer. The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit. Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in
  • Sandvik adds to DC hammer drill line
    January 6, 2017
    Sandvik Construction has added the DC125R to its DC family of compact top hammer drill rigs. The remote-controlled self-propelled rig has a four-wheeled carrier that can also be equipped with rubber tracks for added mobility in difficult terrain. Capable of drilling 22-45mm diameter holes, the machine is capable of up to 300-400m3 in an eight-hour shift. The 3,150kg mini rig is powered by a 37kW engine that drives a 5.5kW rock drill. Designed primarily for foundation drilling, road cutting, trenching, line
  • Sandvik adds to DC hammer drill line
    April 16, 2013
    Sandvik Construction has added the DC125R to its DC family of compact top hammer drill rigs. The remote-controlled self-propelled rig has a four-wheeled carrier that can also be equipped with rubber tracks for added mobility in difficult terrain. Capable of drilling 22-45mm diameter holes, the machine is capable of up to 300-400m3 in an eight-hour shift. The 3,150kg mini rig is powered by a 37kW engine that drives a 5.5kW rock drill. Designed primarily for foundation drilling, road cutting, trenching, line