Skip to main content

Doka showcases Cut&Cover tunnel construction solution

Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
February 7, 2013 Read time: 2 mins
Doka says Doka CC is its first system specifically for cut and cover tunnel builds
Austrian firm 203 Doka will be showcasing at 688 Bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely.

Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade steel members is said to have enabled the weight to be considerably reduced. These attributes are said to make for quick system set-up and great ease of use on the site.

The Doka CC system provides, says Doka, a high degree of safety against base failure. Safe shoring is possible whenever needed, regardless of the type of foundation. Another benefit claimed by Doka when using this variable tunnel formwork system is that it is geometry-independent and can be adapted to even the most challenging shapes and routes of a tunnel.

The tunnel formwork traveller has an all-hydraulic wheel system that is said to allow it to be three-dimensionally aligned with millimetre precision, without needing to be set down between alignments. Even gradients of as much as 10% are claimed to be easily negotiated. A slide-type solution for the new stop-end system saves time when stripping out, and the integral platform system and ladderways are said to provide a high level of safety.

Other Doka formwork solutions for transport infrastructure at bauma are the firm’s composite forming carriage, Bridge formwork ParaTop, and DokaShore.

The formwork specialists are exhibiting at bauma under the slogan: ‘Pathbreaking. Beyond Solutions’.

Stand: FGN.N817

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.Doka.com www.Doka.com false http://www.doka.com/ false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • High versatility is claimed for Fayat’s new emulsion plant
    February 11, 2013
    From French firm FAYAT comes its new range of EP 10 emulsion plants equipped with the proven, low noise Bitumill emulsifier system. According to the firm, the plant is highly versatile and can be adapted to meet the needs of low or medium output installations. The equipment is mounted inside a standard 12.2m container making it easier to transport while the system has an ergonomic layout that is said to make it easy to use. An innovative closed-circuit hot water production system is said to reduce energy co
  • Rema Tip Top conveys new products
    April 9, 2013
    Rema Tip Top, focussing on service know-how, has further extended its comprehensive portfolio of industrial applications and now offers both the design and production of Remawell sidewall conveyor belts. These special conveyor belts, constructed from the components (basic belt, sidewalls and cleats) permit the transport of all kinds of bulk material. The three components taken together give a defined transport volume that is constant even if the conveyor routing is vertical or skewed, thus ensuring a consta
  • Perkins will demonstrate how its engine will meet EU Stage IV/US Tier 4 Final emissions regulations
    January 6, 2017
    Perkins will showcase a complete line-up of Stage IV/Tier 4 Final engine solutions at Bauma, ahead of the new legislation next year. The four cylinder 854F-E34TA will demonstrate much of the technology on offer, as it uses Selective Catalytic Reduction (SCR) with an exhaust additive, plus a Diesel Oxidation Catalyst (DOC). Both Perkins’ 3.4 and 4.4-litre engine lines make do without a Diesel Particulate Filter (DPF), though the larger 7 litre will use a DPF as well.
  • Perkins will demonstrate how its engine will meet EU Stage IV/US Tier 4 Final emissions regulations
    February 7, 2013
    Perkins will showcase a complete line-up of Stage IV/Tier 4 Final engine solutions at Bauma, ahead of the new legislation next year. The four cylinder 854F-E34TA will demonstrate much of the technology on offer, as it uses Selective Catalytic Reduction (SCR) with an exhaust additive, plus a Diesel Oxidation Catalyst (DOC). Both Perkins’ 3.4 and 4.4-litre engine lines make do without a Diesel Particulate Filter (DPF), though the larger 7 litre will use a DPF as well.