Skip to main content

Doka showcases Cut&Cover tunnel construction solution

Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
February 7, 2013 Read time: 2 mins
Doka says Doka CC is its first system specifically for cut and cover tunnel builds
Austrian firm 203 Doka will be showcasing at 688 Bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely.

Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade steel members is said to have enabled the weight to be considerably reduced. These attributes are said to make for quick system set-up and great ease of use on the site.

The Doka CC system provides, says Doka, a high degree of safety against base failure. Safe shoring is possible whenever needed, regardless of the type of foundation. Another benefit claimed by Doka when using this variable tunnel formwork system is that it is geometry-independent and can be adapted to even the most challenging shapes and routes of a tunnel.

The tunnel formwork traveller has an all-hydraulic wheel system that is said to allow it to be three-dimensionally aligned with millimetre precision, without needing to be set down between alignments. Even gradients of as much as 10% are claimed to be easily negotiated. A slide-type solution for the new stop-end system saves time when stripping out, and the integral platform system and ladderways are said to provide a high level of safety.

Other Doka formwork solutions for transport infrastructure at bauma are the firm’s composite forming carriage, Bridge formwork ParaTop, and DokaShore.

The formwork specialists are exhibiting at bauma under the slogan: ‘Pathbreaking. Beyond Solutions’.

Stand: FGN.N817

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.Doka.com www.Doka.com false http://www.doka.com/ false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Chengyu makes tracks for worldwide market
    April 22, 2013
    Chinese undercarriage component manufacturer Chengyu Machinery Equipment has set its sights on increasing exports to world markets. The company makes track rollers, carrier rollers, idlers, sprockets and track chain assemblies for machines from two to 40tonnes and exports 60% of its output. It said its products are crack- and abrasion-resistant and with high quality control procedures – only 25 parts in a million fail its quality control. Both its product delivery and after-sales service levels are said to
  • Loadrite introduces its 360° load-out management system
    April 18, 2013
    The new Loadrite 360° management system has been designed to boost efficiency in quarries by integrating communication across all stages of an order for faster turnarounds and maximised payloads. Loadrite said that the system improves communication throughout the load-out operations. It is aimed at providing quarry managers with the tools they need to get the most from both staff and equipment. Benefits include lower costs per tonne and optimised truck utilisation, said the company.
  • A sophisticated data communications system is offered by Trimble
    January 6, 2017
    Trimble says that its combined device for mobile communications and surveying data collection offers high performance and reliability. Called the Trimble Slate Controller, this rugged new unit is said to combine the convenience and ease-of-use of a smartphone with durability. Optimised for use with the Trimble Access field software and the Trimble R4 GNSS receiver, the Trimble Slate Controller supports a surveyor’s workflows. Offering voice, SMS text, and 3.75G cellular data transfer capabilities on GSM cel
  • A sophisticated data communications system is offered by Trimble
    March 8, 2013
    Trimble says that its combined device for mobile communications and surveying data collection offers high performance and reliability. Called the Trimble Slate Controller, this rugged new unit is said to combine the convenience and ease-of-use of a smartphone with durability. Optimised for use with the Trimble Access field software and the Trimble R4 GNSS receiver, the Trimble Slate Controller supports a surveyor’s workflows. Offering voice, SMS text, and 3.75G cellular data transfer capabilities on GSM cel