Skip to main content

Doka showcases Cut&Cover tunnel construction solution

Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
February 7, 2013 Read time: 2 mins
Doka says Doka CC is its first system specifically for cut and cover tunnel builds
Austrian firm 203 Doka will be showcasing at 688 Bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely.

Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade steel members is said to have enabled the weight to be considerably reduced. These attributes are said to make for quick system set-up and great ease of use on the site.

The Doka CC system provides, says Doka, a high degree of safety against base failure. Safe shoring is possible whenever needed, regardless of the type of foundation. Another benefit claimed by Doka when using this variable tunnel formwork system is that it is geometry-independent and can be adapted to even the most challenging shapes and routes of a tunnel.

The tunnel formwork traveller has an all-hydraulic wheel system that is said to allow it to be three-dimensionally aligned with millimetre precision, without needing to be set down between alignments. Even gradients of as much as 10% are claimed to be easily negotiated. A slide-type solution for the new stop-end system saves time when stripping out, and the integral platform system and ladderways are said to provide a high level of safety.

Other Doka formwork solutions for transport infrastructure at bauma are the firm’s composite forming carriage, Bridge formwork ParaTop, and DokaShore.

The formwork specialists are exhibiting at bauma under the slogan: ‘Pathbreaking. Beyond Solutions’.

Stand: FGN.N817

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.Doka.com www.Doka.com false http://www.doka.com/ false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Wacker Neuson adds to telehandler range
    April 19, 2013
    Wacker Neuson has added two compact telescopic handlers to its range – the TH412 and the TH625. The machines offer maximum heights of 4.31m and 5.73m respectively, with lift capacities of 1.2tonnes and 2.5tonnes. Despite their compact dimensions they retain large telescopic-handler design features, such as all-wheel steering and generously-sized cabs, standard on the TH625 and optional on the smaller model. The two loaders are equipped with Wacker’s VLS vertical lift system, which avoids overloading throug
  • Trimble introduces grade control simulator for bulldozer operator training
    January 6, 2017
    Trimble used bauma 2013 to introduce a construction grade control simulator for the specific purpose of training bulldozer operators. The simulator enables Sitech Technology dealers to deliver training on the GCS900 grade control system in a safe and realistic environment, without removing a bulldozer from production duties to carry out operator training. Trimble’s grade control simulator features fully interactive joysticks, a motion platform, decelerator and CB460 control box, enabling bulldozer operators
  • Trimble introduces grade control simulator for bulldozer operator training
    April 19, 2013
    Trimble used bauma 2013 to introduce a construction grade control simulator for the specific purpose of training bulldozer operators. The simulator enables Sitech Technology dealers to deliver training on the GCS900 grade control system in a safe and realistic environment, without removing a bulldozer from production duties to carry out operator training. Trimble’s grade control simulator features fully interactive joysticks, a motion platform, decelerator and CB460 control box, enabling bulldozer operators
  • Piling productively with PTC’s latest rig
    January 6, 2017
    High versatility is claimed for the new PTC 20RHV Vibrodriver piling unit, which can drive and extract profiled sections of sheet piling, H, concrete or wooden piles. This highly productive machine offers an integrated solution including the rig with its guiding pole, as well as the novel Vibrodriver, hydraulic hammer and press. The equipment is said to cut driving time is cut sharply as the rigs are fitted with powerful winches. In addition, the rigs require a comparatively small space on-site and are high