Skip to main content

Doka showcases Cut&Cover tunnel construction solution

Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
February 7, 2013 Read time: 2 mins
Doka says Doka CC is its first system specifically for cut and cover tunnel builds
Austrian firm 203 Doka will be showcasing at 688 Bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely.

Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade steel members is said to have enabled the weight to be considerably reduced. These attributes are said to make for quick system set-up and great ease of use on the site.

The Doka CC system provides, says Doka, a high degree of safety against base failure. Safe shoring is possible whenever needed, regardless of the type of foundation. Another benefit claimed by Doka when using this variable tunnel formwork system is that it is geometry-independent and can be adapted to even the most challenging shapes and routes of a tunnel.

The tunnel formwork traveller has an all-hydraulic wheel system that is said to allow it to be three-dimensionally aligned with millimetre precision, without needing to be set down between alignments. Even gradients of as much as 10% are claimed to be easily negotiated. A slide-type solution for the new stop-end system saves time when stripping out, and the integral platform system and ladderways are said to provide a high level of safety.

Other Doka formwork solutions for transport infrastructure at bauma are the firm’s composite forming carriage, Bridge formwork ParaTop, and DokaShore.

The formwork specialists are exhibiting at bauma under the slogan: ‘Pathbreaking. Beyond Solutions’.

Stand: FGN.N817

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.Doka.com www.Doka.com false http://www.doka.com/ false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • TESMEC Group’s multi-purpose solutions
    April 9, 2013
    The design and production of high powered tracked trenchers for linear excavation and bulk excavation and surface mining is one of many areas of expertise associated with the TESMEC Group. TESMEC also designs and manufactures machines and integrated systems for the stringing and maintenance of power lines; integrated solutions for the efficiency, the management and the monitoring of power grids; machines for the stringing, maintenance and diagnostic of railway power lines; and the design and production of G
  • Asphaltica exhibition and conference will provide asphalt road knowledge
    October 31, 2012
    The global economy is still suffering, and many believe investment in road and other infrastructure is the key to its revival Over the past 14 years in Italy, only 187km of new highways have been made, but, at the same time, the amount of vehicles using the country’s roads has grown by nearly 10 million. It is in this context of financial concern and growing burden on existing road infrastructure that the sixth edition of ASPHALTICA, the only European event exclusively dedicated to the world of asphalt, bit
  • Getech’s versatile sludge treatment solution
    April 5, 2013
    Due to an innovative and strong frame design and the use of premium raw materials and components, Getech/Gennaretti centrifuges can be employed across mining, tunnelling, petroleum and chemical industry-based sludge treatment processes. They can also be built in mobile plants on containers, easy to transport to remote areas and quick to install, able to manage sludge volumes going from 5 to 150m³ per hour.
  • High mobility is claimed for CIFA’s concrete plant
    February 7, 2013
    High mobility is claimed for CIFA’s mobile concrete batching plant, the CIFAMOBILE 50. “This is the first ever CIFA concrete batching plant we’ve built. It’s highly mobile and can be transported on wheels,” said Marco Brambati, director of marketing and business planning at the firm. The machine features a mixer that can produce 1/3 of concrete/cycle. This DNA 1.0 mixer is the smallest in the CIFA range (while the largest has a 3m3 capacity) and can deliver up to 50m3/hour of ready-mixed concrete. The plant