Skip to main content

Discussions on next stage of engine emissions

Discussions on the next stage of engine emissions controls for Europe will commence in due course. This will follow the completion of the EC Consultation process on Stage V Emissions, which is being closed shortly. The consultation on the next round of changes to the engine emissions directive has been taking key topics under consideration. This is reviewing possible extensions to the legislation to include large and small engines and more petrol engines. Setting new stages including a Stage V with particle
March 15, 2013 Read time: 1 min
Discussions on the next stage of engine emissions controls for Europe will commence in due course. This will follow the completion of the EC Consultation process on Stage V Emissions, which is being closed shortly. The consultation on the next round of changes to the engine emissions directive has been taking key topics under consideration. This is reviewing possible extensions to the legislation to include large and small engines and more petrol engines. Setting new stages including a Stage V with particle counting is also being considered, along with in-service conformity checking, the use of alternative fuels and potential modifications to the flexibility scheme. Equipment manufacturing associations are currently working on their input to the 2465 European Commission consultation.

For more information on companies in this article

Related Content

  • Geosynthetic drainage technology developments
    June 13, 2012
    An innovative solution to providing vital, low-impact surface water control for one of Britain’s largest local authority road schemes is said to have been recently achieved using Hydro International’s (HI) Hydro Vortex Drop Shaft  ow control technology. The new 7km bypass built by Costain at Church Village, near Pontypridd, South Wales, required careful planning to minimise its effect on the countryside and the local environment. Rhondda Cynon Taff Council needed to bypass Church Village to reduce traf c
  • Sandvik’s DT1131i jumbo and iSURE software in Iceland and Norway
    August 14, 2019
    Sandvik’s DT1131i three-boom, electro-hydraulic jumbo, iSURE tunnel management software and the latest drill bit hardware were recently put to the test in Iceland and Norway* Czech contractor Metrostav recently achieved 105m of tunnel excavation in a record-breaking six days. But it will be consistent performance and progress that will see Iceland’s Dyrafjordurgong Tunnel in the remote Westfjords region open on time and on budget. The 5.3km Dyrafjordurgong Tunnel is costing around €69 million and due
  • Connected vehicles: implications for road networks and mobility
    May 15, 2019
    Mobility services are expected to undergo spectacular changes within the next two decades with the introduction and widespread use of connected and autonomous vehicle (CAV) technology. However, the transition phase from human driving to self-driving will be gradual, requiring incremental interventions on the physical and digital road network to allow it to cope with mixed vehicular traffic. Cities such as Dubai have embraced the challenge by setting a target to reach 25% driverless trips by 2030 as part o
  • GNSS road pricing a step closer
    April 12, 2012
    IRF BPC bringing GNSS-based road pricing a step closer to maturity. Today, road transport faces major challenges such as the ever-increasing need for safety, as well as for reduced congestion and pollution. These problems are particularly critical in highly populated zones, notably big cities and their surrounding areas. Different schemes are being proposed to improve the situation, including road pricing systems to automatically charge drivers for their use of road infrastructures.