Skip to main content

Digital Construction Works develops new fully-integrated highway design and construction workflow tool

DCW’s latest software allows highway professionals to get new “insights” and “save valuable time” by analysing and visualising project data in a far more intelligent way
September 7, 2022 Read time: 2 mins
How DCW’s new Integrated Highway Workflow integrates OpenRoads Designer, SYNCHRO 4D, MAGNET, and Sitelink3D to connect the site to the office in one seamless cycle

Digital Construction Works (DCW), a joint venture formed in October 2019 between Bentley Systems and Topcon Positioning Group, has developed “a fully-integrated highway design and construction workflow where all of the project data is combined within the platform,” says the company’s chief executive officer Jason Hallett. Everything is intelligently put together in “a place where it can be analysed and visualised into valuable project insights.”

DCW is focused on digital integration and automation services across the whole construction sector, and the new workflow tool will allow contractors to integrate the schedule and the tasks of machines on site. “If you could do that automatically, you don’t have to do double entry,” says Hallett. “You’re not wasting a whole bunch of time. You can communicate even with subcontractors doing that work in a more efficient and automated way. So that’s one thing we’re really focused on.

“And, of course, we’re focused on round-tripping the data back from that system, as well. We want to do it in a way that, for example, allows the subcontractor working for the GC to review and then approve the information they want to push back. And we do it all digitally.”

The idea “came from one of our shareholders, Bentley,” says Hallett. The driving force was “the integration of Bentley’s OpenRoads Designer for design, SYNCHRO 4D, which is their planning tool, with Topcon’s MAGNET mass haul and Sitelink3D product. Topcon is also one of our shareholders.”

Jason Hallett has been CEO of DCW since January 2022 after holding the position of Chief Operating Officer since the company’s inception. Prior to DCW, Jason served as Vice President of Global Software Business Development and Digital Construction at Topcon Positioning Systems.

If you would like to read more about DCW and see our full interview with Jason, please go to: https://www.worldhighways.com/feature/conquer-technology-interoperability-gaps-dcws-productivity-focused-and-digitally-connected

Or, if you would like to see Jason’s interview in a video format, please go to: https://www.worldhighways.com/video/digital-construction-works-roundtable-interview

The feature fist appeared in the 2022 edition of Global Report: https://digital.worldhighways.com/2022/globalreport/html5/?pn=1

For more information on companies in this article

Related Content

  • Runway resurfacing in Brussels
    April 2, 2021
    Years of heavy use meant that runway 25 at Brussels Airport required attention, with a full resurfacing needed. Smooth runways are vital for large international airports as they optimise safety and reduce wear and tear on expensive aircraft, in addition to boosting comfort for airline crews and passengers.
  • Komatsu aims to be completely carbon neutral by 2050 
    October 27, 2022
    Komatsu has committed itself to achieving carbon neutrality by 2050 and says that by 2030 it will have halved its CO₂ emissions versus 2010. The aim is zero emissions.
  • Making machines last another generation
    October 1, 2023
    The shift toward a circular economy approach is key to the transition towards net zero carbon emissions. At Volvo Construction Equipment (Volvo CE), keeping construction machines – and their parts – in action for longer, to maximise their useful life, is a core part of its sustainability ambitions.
  • Precision narrows the gap between design software and GIS
    March 20, 2012
    Greater precision is helping blur the boundaries between GIS technology and design software While GIS map based technology has extended its range across an ever more universal spectrum of uses in the highways sector, it is increasingly showing weaknesses for engineering purposes. It is very often not accurate enough. This has not mattered previously because the GIS tool has been seen essentially as an automated version of paper based systems from the design department's point of view. Where engineers