Skip to main content

Date set to complete D1 Višňové Tunnel section

The D1 section between Lietavská Lúčka and Dubná Skala in Slovakia includes the partially completed 7.5km twin-tube Višňové Tunnel - to be the country's longest.
By David Arminas July 20, 2023 Read time: 2 mins
The Višňové Tunnel – seen here before further work was started after changing contractors – is part of Slovakia’s longest motorway (image © Peter Lovás/Dreamstime)

Construction of the D1 between Lietavska Lucka and Dubna Skala in northern Slovakia, which includes the Višňové Tunnel, is to be completed within two years.

According to Slovakia’s national road company, NDS, the cost of the project has risen by around €23 million to just under €278 million since the original work was awarded in 2015.

The package of works is for the 13.5km D1 highway between Lietavská Lúčka and Dubná Skala and includes construction of the partially completed 7.5km twin-tube Višňové Tunnel – to be the longest road tunnel in Slovakia. The section will help reduce journey times in the area around Žilina.

A consortium led by Skanska’s Slovakian business is the main contractor for the project after being awarded the work in early 2021. Skanska took over the project from the original contractor, the Italian-Slovak consortium of Salini Impregilo – now Webuild - and Dúha. Completion, originally set for the end of this year, has been delayed due to deterioration of the tunnel due to the hiatus of work when switching contractors. Drainage issues were a major problem, according to media reports.

The D1 is an east-west motorway that connects Bratislava through to Michalovce and the border with the Ukraine. It is the main motorway in Slovakia as well as being the country’s longest and busiest motorway, forming part of several pan-European roures, including the E50, E58 and E75. With the exception of sections in Bratislava, a vignette is required to use the motorway.

Last year, NDS has tendered for tunnel and vehicle IT equipment for the Visnove Tunnel, with an expected cost of around €71.5 million. The contract also includes IT equipment for the D1 motorway stretch Lietavska Lucka and Dubna Skala.

Meanwhile, seven regions in Slovakia have been given the green light to apply for government funding aimed at the modernisation, reconstruction and construction of Class II and III roads, including bridges. Around €21 million has been earmarked for road reconstruction, while €10 million will be allocated for bridge reconstruction. The Bratislava region is not included in the call.

Up to €170 million is now being allocated for the upgrade of Class II and III roads, with around €165 million allocated to the development of transport links in less developed regions.

For more information on companies in this article

Related Content

  • Metrostav/Strabag win Edvard Benes deal
    November 23, 2023
    The €22 million renovation on the bridge over the Elbe in the Czech Republic will start in 2025.
  • Costa Rica ring road project restarts
    April 20, 2021
    Works on Costa Rica’s capital ring road have restarted.
  • Atkins sells stake in London’s M25 ring road
    December 14, 2016
    Infrastructure engineering firm WS Atkins sold its stake in London’s M25 orbital road to a consortium of institutional investors for nearly €79 million (£66.3 million). Atkins, a publicly listed UK company, sold to Edge Orbital Holdings 2 Limited and the deal for its minority stake is expected to be complete by March 2017, the end of the financial year, according to a statement by Atkins. In October, the Edge Orbital consortium picked up Skanska’s 40% stake in Connect Plus, which manages the M25. Skanska so
  • Highways England: Lower Thames consultation
    July 14, 2021
    Earlier this year, Highways England announced that the three joint ventures, BFV, Bouygues Murphy and Dragados-Hochtief will be invited to enter into a competitive dialogue.