Skip to main content

Costly bridge link

Costs are climbing for the proposed new bridge to link Denmark and Germany. The structure is now expected to cost €282 million. This represents a significant increase from the €192 million estimated just 18 months ago. Meanwhile the cost of the environmental permit has also doubled.
May 30, 2012 Read time: 1 min
Costs are climbing for the proposed new bridge to link Denmark and Germany. The structure is now  expected to cost €282 million. This represents a significant increase from the €192 million estimated just 18 months ago. Meanwhile the cost of the environmental permit has also doubled.

Related Content

  • Bridge safety should become a key US concern
    May 14, 2018
    Bridge safety is a key concern in the US, where so many structures are deficient - *Mary Scott Nabers. There are more than 54,000 structurally deficient bridges in the US. That designation does not mean the bridges are in imminent danger of collapsing, but it does mean that they need immediate attention. That fact becomes more alarming when one realises that every day more than 174 million motorists drive over the nation’s structurally deficient bridges. And, there are no plans for repairing the majority of
  • Romania’s latest Danube bridge project shaping up as costly
    September 4, 2017
    The cost for Romania’s newest bridge project over Danube River will likely be around €500 million, according to the latest media reports. Planning and design of the bridge is expected to take 18 months followed by 36 months for construction. The Bridge could be up to 23km including approach roads, depending on routes and geological conditios. It will be built between the towns of Braila and Jijila, in the Dobrogea Region, southeast Romania.
  • Cost of Germany’s A94 autobahn expansion rises by 75%
    September 18, 2017
    The cost of expanding the A94 autobahn between Pastetten and Heldenstein in Germany is likely to be 75% higher than originally estimated.
  • Poland: GDDKiA sets winter road maintenance budget
    October 22, 2014
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) is planning to spend US$151.37 million (€118.3 million) on winter-specific road maintenance for 2014/15. Around 2,300 snowploughs and 1,300 salt trucks will be readied for winter work. GDDKiA also plans to install more than 1,400km snow-protection screens along roads. Meanwhile, the country is moving ahead with several key highway projects, one involving construction of three sections of the new southern ring road around the Polish c