Skip to main content

Chilean bridge project to Chiloe Island delayed

Delays to the project to construct Chile’s Chacao Bridge mean that an additional two years may be required for the work. The work is now being carried out solely by a consortium, Consorcio Puente Chacao, headed by the South Korean contractor Hyundai.
October 31, 2018 Read time: 2 mins

Delays to the project to construct Chile’s Chacao Bridge mean that an additional two years may be required for the work. The work is now being carried out solely by a consortium, Consorcio Puente Chacao, headed by the South Korean contractor 236 Hyundai. The consortium asked for an extra US$200 million to carry out the project, in addition to extending the work by two years. The bridge was originally planned to be complete by 2020 but the various delays so far mean that it will not now be ready for traffic until 2023. The extra costs mean that the final bill for the project could be $900 million. 

A suspension bridge design was selected  for the link as it was thought to be best able to cope with the extremes of weather, as well as the massive earthquakes that can occur in the area. At 2.75km long, this will be South America’s longest suspension bridge once complete, with main spans of 1,055 and 1,155m. According to Hyundai, progress is being achieved on the project and the design for the south pillar is now complete.

Once the bridge is complete it will help to redevelop the economy of Chiloe Island. At present the inhabitants rely on a ferry service however the new bridge will speed transport and reduce journey times, boosting the economy and also helping to develop tourism. 

The bridge has been discussed for some years. An earlier plan for the project was cancelled over concerns about its costs. However the current project was commissioned as the suspension bridge configuration offered considerable cost benefits over the previous design, while delivering the expected connectivity to the island.
 

For more information on companies in this article

Related Content

  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Bridging the gap in African infrastructure
    December 20, 2013
    Leading formwork manufacturers have secured some impressive contracts in Africa, as the continent’s transport infrastructure continues to improve at a rapid pace. Meanwhile, other bridgework equipment companies are also seeing their products in demand in Africa, as well as North America and Australia.
  • South Sudan road link project
    September 30, 2022
    A major road project for South Sudan has been awarded.
  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.