Skip to main content

Bulgarian plan

Greek contractor Aktor is currently preferred bidder for construction of Bulgaria’s new Trakia highway. This road will link Nova Zagora and Yambol and the plan calls for the highway to be complete within a 25-month period. Apart from Aktor, bids were also submitted by ten companies.
May 30, 2012 Read time: 1 min
Greek contractor 1570 Aktor is currently preferred bidder for construction of Bulgaria’s new Trakia highway. This road will link Nova Zagora and Yambol  and the plan calls for the highway to be complete within a 25-month period. Apart from Aktor, bids were also submitted by ten companies.

For more information on companies in this article

Related Content

  • Improving a key route through Florida
    November 9, 2015
    Upgrading a key route through Florida – novel construction techniques are helping widen a road in difficult geological conditions – Lucio Garofalo reports. A major road widening project underway in Florida is due for completion soon. The work will improve an important section of road, reducing congestion at peak period and cutting travel times for drivers. The US 331/SR83 highway runs for some 79km and provides an important link in Florida’s Panhandle area, as it connects with Route 98.
  • New East Africa highway connecting Kenya, Tanzania, South Sudan
    June 8, 2016
    East African countries continue to implement a road Master Plan developed jointly under the East African Community initiative and which aims at integrating the region’s transport corridors to meet the growing demand for road transport by the increasing intra-regional trade and vehicular traffic. Kenya has for example unveiled a US$280 million road rehabilitation project to improve its links with Tanzania and South Sudan with the backing of the African Development Bank (AfDB). Rehabilitation of the 172
  • Serbia speeding spending on roads
    May 21, 2014
    Serbia is planning to speed construction of its highway network. A key project being prioritised is the Corridor 10 motorway, which is due for completion by September 2016. Another priority project is for Corridor 11 and for several regional road routes. At present the Corridor 10 sections between Sid and Belgrade, and Subotica and Belgrade have been built, while work on the 22km Ipsilon stretch between Subotica and Kelebija is underway. Work is also underway on the 96km south node from Grabovnica to Presev
  • Ritchie Bros landmark auction to mark opening of UK site.
    August 23, 2012
    Ritchie Bros. Auctioneers, the world’s largest industrial auctioneer, will celebrate the Grand Opening of its new UK auction site with an unreserved public equipment auction on 18 September, 2012. A ribbon-cutting ceremony will take place on the morning of the auction to officially mark the opening of the Canadian firm’s new Donington Park, central England base.