Skip to main content

Bulgarian plan

Greek contractor Aktor is currently preferred bidder for construction of Bulgaria’s new Trakia highway. This road will link Nova Zagora and Yambol and the plan calls for the highway to be complete within a 25-month period. Apart from Aktor, bids were also submitted by ten companies.
May 30, 2012 Read time: 1 min
Greek contractor 1570 Aktor is currently preferred bidder for construction of Bulgaria’s new Trakia highway. This road will link Nova Zagora and Yambol  and the plan calls for the highway to be complete within a 25-month period. Apart from Aktor, bids were also submitted by ten companies.

For more information on companies in this article

Related Content

  • Mumbai names BrihanMumbai Municipal as winner for coastal freeway
    April 15, 2015
    The state government of Maharashtra in India has named BrihanMumbai Municipal Corporation (BMC) as preferred bidder for construction of Mumbai’s Coastal Freeway worth around US$1.36 billion. The 35.6km freeway, subject to clearance from the central government in New Delhi, will run from Mumbai’s business district, called Nariman Point, to the northern suburb of Kandivli. Coastal Freeway, which runs beside the sea, on reclaimed lands, landfill sites and some small bridges, is the alternative to the mor
  • Asphalt milling optimised by 3D controls
    February 20, 2012
    3D machine controls can optimise milling efficiency, Mike Woof reports. More efficient milling and recycling operations can be carried out by using the latest 3D control systems on the market. At the last Trimble Dimensions event in Las Vegas, the advantages of 3D controls for milling operations proved a key topic. The use of 3D control systems can offer huge advantages in milling operations. This technology helps increase productivity as the milling machine will only remove what is required, which also hel
  • Nepal’s road network continues to develop
    October 15, 2012
    Data from the Nepalese Government shows that work is on-going to upgrade the country’s road network. Public Road Statistics from the Ministry of Physical Planning, Works and Transport Management show that 1,180km of new roads have been constructed in Nepal in the 2011-2012 fiscal year. The statistics reveal that of the 1,180km of roads, 290km were surfaced with asphalt and 407km were gravel roads, while there were also 47 new bridges built in the period. The target for the 2011-2012 fiscal year however was
  • Cengiz wins Corridor VC contract in Bosnia
    March 21, 2023
    Cengiz submitted the lowest bid in the tender which attracted three offers in the deal said to be worth around €361.8 million, according to Bosnia’s state highways agency Autoceste.