Skip to main content

Bridge replacement programme for Pennsylvania

A major programme of bridge replacement works on Pennsylvania will see the state replacing 558 highway bridges over a period of three years. The work is expected to cost in the region of US$899 million to carry out and was awarded by the Pennsylvania Department of Transportation (PennDot) to a group of firms called Plenary Walsh Keystone Partners. The package of works includes construction of the bridges over three years as well as a 25 year maintenance deal. The Plenary Walsh Keystone Partners comprises Gr
October 31, 2014 Read time: 1 min
A major programme of bridge replacement works on Pennsylvania will see the state replacing 558 highway bridges over a period of three years. The work is expected to cost in the region of US$899 million to carry out and was awarded by the 2535 Pennsylvania Department of Transportation (PennDot) to a group of firms called Plenary Walsh Keystone Partners. The package of works includes construction of the bridges over three years as well as a 25 year maintenance deal. The Plenary Walsh Keystone Partners comprises 1007 Granite Construction, Walsh Group and 2418 HDR Engineering. Construction will commence in the summer of 2015 followed by completion within three years. Inclusive of financing costs, an average of $65million/year will be paid by the state under the contract's 28-year term for $1.82 billion in total.

For more information on companies in this article

Related Content

  • RFQ is out for the Gordie Howe Bridge to link US and Canada
    July 22, 2015
    The bidding process has started for the Gordie Howe International Bridge that will link Detroit in the US state of Michigan and Windsor, in the Canadian province of Ontario. The Windsor-Detroit Bridge Authority (WDBA) has sent out a request for qualifications (RFQ) for the bridge that will likely be either cable stayed or suspension to cross the Detroit River. The bridge also likely will come with a hefty price tag – around US$1.62 billion, as World Highways reported in May in a feature on the proposed b
  • US bridges needing repair or replacement
    September 13, 2024
    Nearly 221,800 US bridges are needing repair or replacement.
  • Bertha restarts work on Seattle’s Alaskan Highway Viaduct project
    September 19, 2016
    Bertha, the tunnelling machine that is making its way under the US city of Seattle, has restarted work after nearly three weeks of scheduled maintenance downtime. The machine has been sitting more than 51m underground while crews replaced of 14 large cutting tools, according to the Washington State Department of transportation. Each tool weighs just under 275kg. Bertha - as the SR 99 tunnelling machine is called – is working on the Alaskan Way Viaduct Replacement Program. The Alaskan Way is an elevate
  • Tenders being opened in Brazil for highways and tunnel projects
    February 6, 2014
    A series of major project tenders are opening in Brazil. The Brazilian Government has announced five new road tenders to be launched in 2014. The highway sections run for a total distance of some 2,625km. This programme of works will lengthen the country’s highway network by some 2,282km, with the work costing an impressive US$7.39 billion in all. The roads include the BR-163, BR-364 and BR-153 in the Central West region, and the BR-476 stretch in the South, in addition to the Rio-Niteroi Bridge in Rio de J