Skip to main content

Bell’s new logistics facility to ensure ultra-quick replacement ADT parts for customers

Bell customers across Europe are to receive their replacement articulated dump truck parts quicker than ever before after the South African hauling giant completes its new giant logistics facility in Germany.
January 6, 2017 Read time: 2 mins
Marc Schürmann, Bell’s European managing director, has revealed company plans for a new larger European logistics centre
1240 Bell customers across Europe are to receive their replacement articulated dump truck parts quicker than ever before after the South African hauling giant completes its new giant logistics facility in Germany.

Marc Schürmann, Bell’s Europe managing director, told The Daily News that the new facility in Alsfeld, central Germany, will be 12,000m², compared to the current 7,000m² facility on an adjacent site.

“It’s on the cusp of two north, south, east and west autobahn crosses in Germany. The location almost right in the centre of Germany. It’s an hour’s drive from Frankfurt, so we can have a parts pick up late afternoon, get it on the plane at night, and deliver it to the customer or dealer the very next morning.

“With the changes to the E-Series, we bought additional property and aim to do a green field development of a new facility that will be ultra-modern and have all the latest technology. From that facility we hope to deliver 24-hours-a-day.”

Bell’s final assembly facility for the Northern Hemisphere is also only one hour’s drive from Alsfeld in Eisenach – near the former East German border.

Schürmann also said that Bell was planning to bring a 60 tonne E-Series ADT onto the market by the end of next year, following the launch later in 2015 of its 50 tonne payload B50E model – a prototype of which has been exhibited this week at INTERMAT 2015. The B50E is equipped with a Stage IV/Tier 4 Final emissions compliant MTU 6R1300 engine.

“The B50E offers a five per cent improvement on fuel efficiency than our other ADTs, due to the latest engine technology on the model. We also focus on every component to give us the best weight to performance benefit, which sets us apart from many of our competitors. We are not bound to use the in-house engine, transmission or axles. We can go out and find the best trucking application.”

Schürmann said Bell expect the B50E to sell well in the UK, and the firm is looking to increase its overall range sales in the large Scandinavian quarrying sector, as well as in high growth potential territories such as North Africa, Turkey and Russia.

For more information on companies in this article

Related Content

  • Innovative fuel injection reduces emissions
    February 24, 2012
    Stricter emissions legislation mean that new engine technology and integrated drivetrain systems are being developed. With the Tier 3/Stage IIIA emissions legislation now in place in North America and Europe, the major engine manufacturers already have an array of solutions on the market. The coming Tier 4 interim/Stage IIIB legislation will be tougher still and most firms are well in hand with their plans to use both in-cylinder and exhaust after-treatment technology. While engines themselves are staying b
  • Keestrack’s growing presence in China
    November 21, 2018
    Keestrack is introducing a comprehensive range of large tracked mobile machines to the Chinese market. These encompass all relevant screening and crushing technologies for quarrying, recycling and aggregates industry sectors. Four important new models are being unveiled. The B4 jaw crusher ensures less wear and better crushing capacities due to its double-deck vibrating pre-screen (2300 x 1000mm). The proven 1100 x 700mm jaw crusher (maximum feed size 600mm) reaches an hourly output up to 400tonnes and pro
  • Boschung e-sweeper now autonomous
    July 16, 2020
    The Urban-Sweeper S2.0 bristles with lidars, cameras, mm-wave radar and gps.
  • Finnish Motorway Finally finished: Finland's M1
    July 23, 2012
    It has taken a long time to complete, but a vital motorway link is open to traffic as Heikki Harri reports After almost 50 years of construction, the M1 motorway linking Helsinki, the Finnish capital city and Turku, the country's old capital in the southwest, is finally completed. It did not take all 50 years of construction but the first section from Helsinki towards the west was constructed in the mid -1960s. Then there was a pause until mid-1990s when the works resumed section by section. The final sect