Skip to main content

Balfour included on major UK Highways Agency framework contract

Balfour wins place on major UK Highways Agency road framework contract Balfour Beatty’s UK construction business has been appointed by the UK’s Highways Agency to a new collaborative framework contract for projects totalling more than US$3.95 billion (£2.5 billion). Under the framework arrangement, Balfour is one of five contractors that the agency can call upon to deliver individual projects worth between $160 million and $713 million (£100 million and £450 million) on Lot 3B of the Collaborative Del
November 7, 2014 Read time: 2 mins
Balfour wins place on major 1441 UK Highways Agency road framework contract

1146 Balfour Beatty’s UK construction business has been appointed by the UK’s Highways Agency to a new collaborative framework contract for projects totalling more than US$3.95 billion (£2.5 billion).

Under the framework arrangement, Balfour is one of five contractors that the agency can call upon to deliver individual projects worth between $160 million and $713 million (£100 million and £450 million) on Lot 3B of the Collaborative Delivery Framework.

The overall framework, which includes lots for other types of work, will deliver the largest ever upgrade of England’s strategic road network, valued between $6.3 billion and $9.5 billion (£4 billion and £6 billion) by 2021.

The framework lasts for four years with an option for a mutually agreed one-year extension. Individual contracts within the framework will be allocated either through the agreement of target costs or by mini-competitions where several tenders are submitted.

Nicholas Pollard, Balfour Beatty construction services UK chief executive, said the company has a strong record delivering major contracts by working closely with the Highways Agency. Balfour Beatty, in partnership with 2296 Skanska, 3005 Atkins and 2643 Egis, delivered a 30-year $9.8 billion (£6.2 billion) M25 design build finance and operate project which included widening more than 100km of motorway to four lanes.

Balfour Beatty is also currently delivering the agency’s $291 million (£184 million) Manchester Smart Motorway scheme and the $204.4 million (£129 million) M3 Smart Motorway scheme.

The framework is intended to promote collaborative behaviour, such as standardisation and pre-fabrication, in order to lower costs, deliver better quality faster and to improve health and safety behaviour.

Graham Dalton, Highways Agency chief executive, said the framework is the largest that the agency has awarded. “It is not just the scale of this framework that is important, but the way it is designed to bring the agency, designers and contractors together in one large collaborative team. We expect to deliver this major investment programme efficiently, speedily and with real effort to minimise disruption to road users while we build,” he said.

For more information on companies in this article

Related Content

  • Norway’s E10 project is officially underway
    August 7, 2023
    Hålogalandsvegen/Skanska will finance, build, maintain and operate a section of the E10 Hålogalandsvegen and Highway 85 Tjeldsund–Gullesfjordbotn–Langvassbukt north of the Arctic Circle.
  • Premium ponds
    April 25, 2012
    A series of balancing ponds are being used to create a sustainable drainage solution on the Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire. Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by Hydro International’s Hydro-Brake Flow Cont
  • Premium ponds
    May 3, 2012
    A series of balancing ponds are being used to create a sustainable drainage solution on the Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire. Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by Hydro International’s Hydro-Brake Flow Cont
  • Kazakhstan announces infrastructure investment programme to 2020
    April 2, 2015
    Kazakhstan’s deputy minister for investments and development Zhenis Kasymbek has said that about US$20 billion will be invested in development of all types of transport infrastructure by 2020. The main funds will be allocated for the Caspian region, in particular for projects to improve connections to Azerbaijan, Georgia and Turkey. Apart from road infrastructure, money will be invested to construct the Beyneu-Zhezkazgan railway and development of the Altynkol-Khorgos railway section in the direction of