Skip to main content

AWPR road project receives Supreme Court go ahead

The US $ 637.36 million (£ 395mn) Aberdeen Western Peripheral Route (AWPR), a scheme that will see the construction of a trunk road around the outskirts of the northern Scottish city, has been given the go ahead by the Supreme Court. The scheme was green lighted after the Supreme Court dismissed objections filed by William Walton, the chair of the Road Sense campaign group. Walton claimed the government failed to comply with correct procedures when devising the route, which also includes a link between the
October 26, 2012 Read time: 1 min
The US $ 637.36 million (£ 395mn) Aberdeen Western Peripheral Route (AWPR), a scheme that will see the construction of a trunk road around the outskirts of the northern Scottish city, has been given the go ahead by the Supreme Court.

The scheme was green lighted after the Supreme Court dismissed objections filed by William Walton, the chair of the 6788 Road Sense campaign group. Walton claimed the government failed to comply with correct procedures when devising the route, which also includes a link between the new road and the town of Stonehaven. Work on the new road is expected to be completed in 2018.

For more information on companies in this article

Related Content

  • European equipment sales up 15% in 2017, according to the CECE
    March 16, 2018
    European construction sales grew by 15% in 2017, according to the Annual Economic Report 2018* from the CECE - Committee for European Construction Equipment. After a very strong first quarter, growth slowed down in the second quarter, before taking off again in Q3 and Q4. Current levels of sales are on par with the levels seen in 2006 and 2008, but the industry is still 20% below the 2007 peak.
  • Controversial Russian bridge opens
    May 16, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link opening to use by cars. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Kamaz truck to reach the city of Kerch. The US$2.7 billion bridge forms part of
  • Controlling influence
    January 3, 2013
    New lane control solutions from major roadmarking companies have been installed on highways across the world over recent months. Guy Woodford reports on some of them. Clearview Traffic Group (CTG) recently clocked up the installation of over 70,000 Astucia active flush and surface mounted road studs in the UK. CTG has been involved in numerous road stud installation projects on motorways and other road types in the UK and many other countries worldwide. Its UK installations include over 4,500 Astucia road s
  • Northern Spire wins award from UK’s Association for Project Management
    November 30, 2018
    The Northern Spire bridge in Sunderland, northern England, has beaten off stiff competition to win another national construction and engineering award. The Spire, which opened in August this year at a cost of €132 million, was named Project of the Year: Engineering, Construction and Infrastructure 2018 by the UK’s Association for Project Management. The award is the latest honour for Sunderland’s 105m-tall cable-stayed bridge which links Castletown on the north side of the River Wear with Pallion.