Skip to main content

Australian key link

Work is progressing according to plan on a key section of the Pacific Highway upgrade project in New South Wales (NSW) Australia.
March 5, 2012 Read time: 1 min
Work is progressing according to plan on a key section of the Pacific Highway upgrade project in New South Wales (882 NSW) Australia. TheUS$360 million work involves removing two highway bridges over Minjungbal Drive and building a 330m viaduct over Central Valley, located in the south part of Sexton Hill. The project also includes realignment work for Laura Street, which will be connected through a four-way intersection to meet with the current Pacific Highway and Short Street. The upgrade work will provide a new link with three lanes of traffic in either direction that features a speed limit of 100km/h.

For more information on companies in this article

Related Content

  • Berlin bridge replacement project planned
    November 11, 2020
    An important Berlin bridge replacement project is being planned.
  • The power of water
    July 18, 2012
    The popularity of hydrodemolition is growing worldwide and was the specified solution for work on two vital Swedish links The hydrodemolition technique, which uses high pressure water jets to remove damaged concrete from various structures, is playing a crucial role in the major restoration of the vital Central Bridge and Söderled Tunnel in the centre of Sweden's capital Stockholm. The 1,550m dual two-lane rectangular box Söderled Tunnel and connecting dual two and three-lane Central Bridge are a vital 2.6k
  • Road tolling is vital for good roads
    January 2, 2024
    Upcoming transportation projects are outlined in planning documents throughout America by Mary Scott Nabers
  • Well structured maintenance
    January 4, 2013
    Major bridge maintenance and replacement projects across the world are extending the life of many impressive historic landmarks as Guy Woodford reports The Tamar Bridge, part of the main A38 trunk road linking Saltash in Cornwall with Plymouth in Devon, south west England, marked its 50th anniversary with a steel deck resurfacing project involving Stirling Lloyd's Eliminator bridge deck waterproofing system. Jointly owned by Plymouth City Council and Cornwall Council, the Tamar has a suspended length of 642