Skip to main content

Auckland’s causeway project

When it is finished in early 2017, the causeway on Auckland’s North-western Motorway, State Highway 16, will have been raised 1.5m to stop flooding at extreme high tides. There will be four lanes city-bound and four/five lanes westbound with dedicated bus lanes in each direction, and the existing North-western cycleway that runs alongside it will be upgraded.
April 4, 2014 Read time: 3 mins
Part of the 4.8km Causeway Upgrade Project on Auckland's North-western motorway which runs through a marine reserve, looking east towards the city - Photography by Greg Kempthorne
When it is finished in early 2017, the causeway on Auckland’s North-western Motorway, State Highway 16, will have been raised 1.5m to stop flooding at extreme high tides. There will be four lanes city-bound and four/five lanes westbound with dedicated bus lanes in each direction, and the existing North-western cycleway that runs alongside it will be upgraded.

More than 10,000 wick drains have already been installed to accelerate consolidation of up to 15m of alluvial marine mud as part of the NZ Transport Agency’s 4.8km, US$183.3 million (NZ$220 million) Causeway Upgrade Project. “Intensive ground reclamation like this is an important part of the project’s work to upgrade and improve this section of the motorway. We are mindful to protect the marine reserve environment where we are working, installing new bird roosts for species which inhabit the area, and silt fences,” said the Transport Agency’s highways manager, Tommy Parker. 

A 2-3M-deep drainage blanket using more than 26,000 truckloads of 19-25mm recycled aggregate has been spread on top of the wick drains. When the settlement has stabilised, construction of new motorway lanes will start on top of it.

The Causeway Alliance – the NZ Transport Agency, AECOM, Coffey, Fulton Hogan, Leighton Contractors and Sinclair Knight Merz – is completing the upgrade.
 
The project is one of five underway or planned to finish the 47km-long Western Ring Route along the South-western, North-western and Upper Harbour motorways, which is identified by the Government as one of its Roads of National Significance to support New Zealand’s economic growth.

The project is the first in New Zealand to adopt temporary orange marking tape to improve lane definition and enhance driver safety. Maintaining traffic flow of almost 100,000 vehicles/day while upgrading this section of the state highway network is a key challenge and driver cooperation is essential.

Mr Parker said that for the first time, Auckland will have direct motorway access between the central business district and the airport, and the Western Ring Route will also better connect people and freight with the city’s rapidly growing areas in the north-west and south-west. 

 “It’s a key part of a massive investment in infrastructure needed to meet the demands of rapid economic and population growth underway in the top half of the North Island,” he said. 

More detailed information on this project will be included in a feature in the April issue of World Highways.

Related Content

  • Delays for New Zealand expressway project
    August 24, 2020
    Delays are hitting New Zealand’s Otaki expressway project.
  • A weighty problem signs change
    October 9, 2012
    In New Zealand city Auckland road signs are suffering excessive wear rates due to structural loads that were utterly unforeseen by highway planners. The problem originates with the city’s ladies of the night, who use the poles of the roadsigns in active dancing displays intended to entice customers. Over 40 roadsigns have been bent in this way, with several having to be replaced. The problem has caused something of an outcry amongst perturbed locals who are less than happy with these, and other, related inc
  • Central Ring Road to become one of most important projects in modern history of road-building in Russia
    December 16, 2014
    Moscow’s new ring road will provide a major economic boost and tackle congestion - Eugene Gerdner writes The Russian Government has officially started building of the Central Ring Road (CRR), one of the largest infrastructural projects in the modern history of the country. Total volume of investments in the project is estimated at more than US$7.2 billion (300 billion RUB). Building of the road should be completed by the World Cup 2018 and will be carried out as part of the existing state program ‘The de
  • Redesign for New Zealand link likely due to landslide risk
    December 15, 2017
    Plans for New Zealand’s US$188.7 million (NZ$270 million) Petone-Grenada road connection are now being revised due to concerns over the risk of landslides. In addition, the redesign will address concerns about the high costs of the new route, which was originally proposed with two lanes in either direction as a connection between Wellington. The new route is expected to carry up to 30,000 vehicles/day and is intended to reduce congestion on a section of State Highway 1 at peak periods. Local officials say